InnerWeb
Skip to main content

Guest group at a keyboard-free registration desk: a plant case

Ten visitors approach the entrance with QR badges, and none of them has a valid induction. At a corrugated packaging plant the registration desk has only a scanner, so the scan decides: a person with a valid induction gets a welcome, and everyone else gets the induction at once, also as a group.

4
answers to a single scan of a badge
Source: card
34 s
re-scan window in one deployment
Source: card

Scene at the entrance: a group and one screen

At the entrance to a corrugated packaging plant there is a screen with a connected scanner. There is no keyboard, no login and no field for entering a code. The only input device is a USB HID scanner. This is a deliberate choice: nobody can read a QR code by eye, and a text field would serve only mistakes and attempts to bypass the rules.

One day a group of representatives from an external company arrives. Some of them have been at the plant before and hold a valid induction, and some are there for the first time. Security does not have time to hold separate conversations with each person, and the OHS induction must take place before entry to the production area.

Problem: telling a trained person from a new one without human judgment

At a traditional gatehouse a guard asks about the induction, looks for the name on a list and hands out a leaflet. The quality depends on who is on shift. At night, with one guard on duty, the induction is sometimes skipped because the queue grows.

The plant needed a decision based on data: scanning the badge checks in the system whether the account has a valid initial induction, and that result selects the path. No person makes the decision, and the screen does not allow it to be bypassed.

Timings in the registration desk mechanism

Timings in the registration desk mechanismBar chart: re-scan window of 34 seconds and closing of the label card after 2 seconds.010203040secondsRe-scan window: 34 seconds34Re-scan windowClosing the label card: 2 seconds2Closing the label card
Source: Registration desk function documentation

Solution: four answers to one scan

A scan returns one of four answers: entry, still inside (welcome repeated), exit after a break longer than the window, or refusal with the induction started. A person with a valid induction sees the welcome and passes. A person without a valid induction gets the initial induction played back at once.

The induction runs in four languages: Polish, English, Russian and Ukrainian, and the account language controls the video and the interface. For a group with mixed languages this means that each participant sees the film in their own language, with no need for security to translate.

Group induction and assembly point

When several people scan their badges one after another, the system collects them into one group. A single playback of the induction covers the whole group, and the group sign-off records the result for each person separately. The sign-off is one-time, so the same group cannot be signed off twice, and the list of people on site stays consistent.

Refusal with a reason

When entry is not possible, the screen gives the reason: account inactive, no health declaration, no induction, no qualifications, permit expired, no permit or planned visit, or other. The operator does not have to guess why the gate does not open.

Re-scan window: so that an exit is not recorded by mistake

Guests often scan their badge twice in a row because they see no reaction. If every scan counted as an exit, a person entering would be recorded as leaving. That is why the re-scan window slides from the last scan of a person on site. In one deployment it is 34 seconds. A repeated scan within that time shows the welcome, and an exit is recorded only after a real break.

The window is set in seconds, so a plant with a longer walk to the gate can extend it. The parameter is a trade-off between convenience and the accuracy of the list of people on site.

Result and conclusions

The effect shows in how the queue behaves: security does not run conversations about the induction, because the screen does it. The group does not block the desk, since the induction is shared, and the group sign-off records all people in one action. The list of people on site has no gaps caused by a skipped induction.

Conclusion for plants: a desk without a keyboard is safer than one with a keyboard, because it removes the channel of mistakes. It does, however, require clear refusal messages, languages for groups and a well-planned re-scan window. The kiosk, scanner and screen are bought and integrated by the plant, and InnerWeb supplies the software behind them.

  • USB HID scanner as the only input: no field for typing a code.
  • The induction starts on its own when there is no valid induction.
  • The group is signed off once, without duplicated results.
  • A re-scan window (for example 34 seconds) protects against a false exit.

Video

Frequently asked questions

Can a guest type the code by hand?

No. The desk has no keyboard, no login and no field for entering a code. The only input is a USB HID scanner.

What happens to a person without a valid induction?

The scan ends in a refusal with the initial induction started. The induction can be played back for the whole group at once.

Which languages does the induction support?

The training desk supports Polish, English, Russian and Ukrainian. The account language controls the video and the interface.

Can the same group be signed off twice?

No. The group sign-off is one-time and records each person's result, so the results do not duplicate.

See the keyboard-free desk in action

Book a demonstration of the registration desk. We will show the scan, the group induction and the refusal messages.

Let's talk