Basic rule: the code is a key to the account, not the data
The QR code on the badge encodes the instance address with a token. The token has 256 bits from a random generator, so guessing codes is not a practical attack. The code itself carries no name or number, and the system's response to identification never returns the scanned code or token, only the identity to confirm.
The practical conclusion: security should treat the badge like an access card. Anyone who holds the code may try to use it, so the processes around the code are decisive: issuing, collection, cancellation and confirmation of identity at the scan.
Printing and issuing
A badge can be printed in the security panel, and for guests the reception tile turns the first and last name into an external account with a registration number and a printed badge in one step. The printer and the stock should be supervised by security, not kept in a publicly accessible room.
When issuing, the rule is simple: the person concerned collects the badge after showing a document, and security records the fact of issue. For maintenance staff who enter the plant at different times, it is recommended to issue the badge before the first shift, not at the gate during the peak hour.
- printing only from the security or reception panel,
- personal collection with a document,
- record of the issue and of the person issuing it,
- one active badge per person.
Example handling time for a report of a lost badge (example calculation)
Cancellation: a new badge, the history stays
Cancelling a QR badge issues a new one, and the badge history stays. As a result, after a report of loss security does not have to delete anything or create the account again. The old badge stops being valid, and when it is scanned at the gate it goes to the cancellation filter, so it does not pass as valid.
An unknown token, a cancelled badge and a made-up string of characters all receive the identical 404 response. A person trying to use an old code will not learn that the code existed, and an attacker cannot check which codes are in the system.
Borrowed badge: confirmation of identity
Lending badges is an organisational risk, not a technical one. On the training tablet a scan logs nothing in: the tablet shows the first name, last name and company of the badge owner, and training starts only after confirmation "Is this you?". On entry from a badge, the company plus login form is not shown, so there is no way to type someone else's login.
At the gate, security sees a verdict made up of valid trainings, qualifications and an active account, as well as the identity of the person. It is worth training security to compare the photo or the data with the person at the gate, especially when lending is suspected.
What InnerWeb does and what stays with the plant
The system is responsible for the verdict, the recording of entries and the badge history. The plant is responsible for the physical issue, the supervision of the printer and the procedure for reporting a loss. If the plant also runs an access control system with cards, the QR badge serves those who have no card and does not conflict with the punches passed on from access control.
Checklist
Video
Frequently asked questions
Can the person's data be read from the QR code?
No. The code contains the instance address and a token. The system shows the person's data only after a scan, for confirmation.
What happens to an old badge after cancellation?
It stops being valid, and a scan returns a 404 response, the same as for an unknown code. The badge history stays.
Can a badge be printed without an account in the system?
A badge is linked to an account. For guests, reception creates an external account and prints the badge in one step.
Want to put QR badges in order at your plant?
We will go through printing, issuing and cancelling in the security panel with you. Book a demo.
Let's talk