The problem that check-out solves
A person who left the site without scanning remains in the system as present. Such an entry inflates the evacuation list: the coordinator searches the building for someone who left long ago, or considers the list unreliable and stops trusting it. Forgotten exits are unavoidable, so a mechanism is needed that closes them.
The mechanism has a second side as well. A threshold that is too short closes the entries of people who are really working, for example on an extended shift or during an emergency stop. Then the evacuation list is incomplete, which is more dangerous than an inflated list.
How the mechanism works
A person staying on the site for more than 12 hours is checked out automatically. The task runs every 3 hours, that is 8 times a day, and the entry is marked as closed automatically. The marking distinguishes the entry from an exit scanned by the person.
The cycle creates a delay: a person who crosses the threshold just after the task has run will be checked out only at the next run, so in the extreme case after almost 15 hours from entry. This is worth remembering when assessing whether the list of people on site is up to date.
Night shift and the 12-hour threshold
A typical night shift lasts eight to twelve hours. On a twelve-hour shift with the journey and the handover, a person may stay on the site for more than 12 hours. The mechanism will then check them out although they are still working, and the evacuation list will stop including them. For such shifts the threshold and the cycle must be assessed against the specific rota.
An automatically closed entry is a signal
An entry closed automatically means that the system did not receive an exit scan. It does not prove that the person left at that time. During an evacuation such a record should be treated as a signal to verify, not as confirmation of exit.
Latest check-out with a 12-hour threshold and a 3-hour cycle
Implementation notes
Before going live, the IT team and the head of security should go through four questions.
- What is the longest real presence on site? Check the shift rotas with the journey, the handover and overtime. If it exceeds 12 hours in practice, plan a procedure for those people.
- Who reviews the entries closed automatically? Agree an owner of the review and a rhythm, for example once a week.
- How to inform employees? The rule is simple: scan your exit. The automatic entry is a safety net, not a replacement for the scan.
- How to link this with the evacuation list? The coordinator should know that entries closed automatically are not confirmation of exit.
Related mechanisms that must be known
After completing group training at the reception post, a further scan within 13 minutes is treated as confirmation of presence, not an exit. A double scan of the same code within 5 seconds is ignored. A blocked entry attempt goes to the register as a refusal entry, but does not count as presence on the evacuation list. Together with automatic check-out these four rules determine who is on the list of people present, so the evacuation coordinator should know all of them.
How to assess whether the settings are good
A good threshold is one at which entries closed automatically concern mainly forgotten scans, not people who are working. Review a sample of such entries quarterly and ask shift leaders whether any of these people were still on the site. If so, the threshold or the cycle needs changing, or those people need a different handling mode. If there are many automatically closed entries, the cause is most often a missing scanner at the pedestrian exit, not the threshold.
Video
Frequently asked questions
Does automatic check-out replace scanning the exit?
No. It is a safety net for forgotten scans. Employees and guests should still scan their exit.
How to tell an automatic check-out from a scanned exit?
The entry is marked as closed automatically, so the difference is visible in the register.
What about people working longer than 12 hours?
They will be checked out although they are still working. Assess the shift rotas and agree a procedure for such cases before going live.