Starting point: a group of 30 and one gate
This is a concept for a mid-sized manufacturer with several halls that takes on a larger group from a temporary staffing agency to start a new shift. We do not describe a specific client here, only a scenario built from the functions the system offers in the modules for external companies and guests.
The traditional process is well known: the agency sends a list in a spreadsheet, security copies the names by hand, the safety team gives the induction in a meeting room and, by evening, nobody can say who from the group actually entered the site and whether they passed the training. With thirty people, one wrong surname or phone number stops the whole queue at the gate.
The goal of the scenario is narrow and measurable: on Monday morning each of the thirty people has an account, a valid introductory training, a QR code and an entry record on the On site list, and the shift supervisor sees all of it on one screen.
Friday: company account and bulk invitation
The plant administrator sets up the external company and its employees in the companies module. A newly added company is immediately available in the Company field of the external staff invitation window, without refreshing the page, so the next steps do not need to wait.
The agency sends a list of email addresses or phone numbers. For an invitation, one of these two fields is enough: once the first one is filled in, the second becomes optional. This matters, because some temporary workers have no mailbox but do have a phone.
With a bulk invitation, the pasted text is converted into unique email addresses, up to 144 per invitation, with a preview of the message before it is sent. The system skips addresses and gives the reason: invalid address, account already exists or invitation already sent. The administrator therefore gets a ready list of exceptions to fix on Friday, not on Monday at 5:55.
Host and date
The invitation names a host, by default the person sending it. The visit date is optional, which lets the agency enter the first working day without blocking registration for people who start later.
Scenario: people ready to enter on each day
Weekend: introductory training before the first day
The introductory training, which is the general and workplace induction, should be completed before a temporary worker is admitted to work. This is how the publicly available summary of the duties related to temporary workers describes it. The detailed split between the agency and the user employer is set out in the contract and in the text of the law.
In the scenario the general part is delivered in the system. It can follow a classic path of materials followed by a test, or a scenario path with steps, where a failed step sends the worker back to the material. The order of answers in the test is shuffled by default on every attempt, so one person's result is not a hint for the person next to them.
The workplace part is led by the person the plant designates on the hall floor. The system does not replace that conversation, but it records the result and the date, so Monday's check at the gate rests on evidence and not on the agency's declaration.
Monday 5:30: QR codes and labels
The operator can resend the QR code by email, and when the account has no email address, by SMS with a link to the code image. This way a person without a mailbox receives the code on their phone before leaving home.
For those without a charged phone or who did not open the message, security prints a label with the QR code from the panel. Every print is recorded in the person's badge history, so it is known how many labels were issued and to whom. The invitation can also include a request to print labels for the office, provided the administrator has set the office address in the mail settings.
In practice, it is worth planning one print station for every twelve to fifteen people in the queue. This is an organisational assumption, not a system parameter.
Monday 6:00: entry and the On site list
Recording an entry or exit from the panel creates a gate record, so the person appears on the On site list and on the evacuation list. An entry for a group stops being something to reconstruct from memory: the shift supervisor opens the list and sees how many of the thirty are already on site.
If the plant has an access control system, card swipes can reach InnerWeb as events from the access control system. InnerWeb does not sell readers or access cards. It receives the events and links them with qualifications, permits and attendance. In a scenario without the agency's own cards, the gate uses the QR code.
What can go wrong and how it shows
The most common issue is a person who entered the site and passed the training but did not set a password. In that case they stay on the invitation list with the No password label, so they do not disappear from the administrator's view. The details are described on a separate page about workers without a password.
The second issue is a typo in a phone number when assigning an existing account to a company. The system requires confirmation, so a typo cannot pull someone else's account into the agency's company.
The third is rotation: the same person comes back from a different agency. Moving a guest to another external company keeps the same account, so training results, the badge and the gate history stay with the person.
- list of exceptions from the bulk invitation before Monday
- No password label for people who entered without a password set
- confirmation when assigning an existing account to a company
- history of label prints in the person's badge
Checklist
Video
Frequently asked questions
Does a bulk invitation create accounts?
No. The person registers on their own through the plant registration link and enters the name of the person who invited them in the Host field. The bulk invitation only sends messages.
What about a person without an email address?
A phone number is enough for the invitation. The QR code can be sent by SMS with a link to the code image.
Does the system replace the workplace induction?
No. The workplace induction is led by a person designated by the plant. The system records the result and the date as proof.
Sources
Let us walk through Monday at your plant
We will show the path from the bulk invitation to the On site list on test data and agree what you need on your side.
Let's talk