Why rotation multiplies the cost of training
A plant with a crew of temporary workers pays for introductory training not once, but as many times as a person appears on the list. When the agency replaces part of the crew every month, introductory training becomes a permanent item in the OHS schedule instead of a one-off start.
Some people come back: to the same plant, to the same workstation, after a break between assignments. If the plant does not remember their result, it trains them again, although it does not have to.
Where the training result gets lost
The result is lost when the plant keeps paper lists, when the person gets a new account or when the agency changes the company name in its records. In such a situation there is neither a date nor a result, so the OHS specialist has no basis to skip the training.
What the account keeps
Transferring a guest to another external company keeps the same account, so training results, the badge and the gate history stay with the person. A result recorded on a duplicate account that was merged is moved to the active account, for up to three merges, and not to a deleted account.
What can be skipped and what cannot
According to the position of the Ministry of Family and Labour (MPiPS), when the same worker is re-employed by the same user employer in the same position, the introductory training does not have to be repeated. This is a narrow case: the same person, the same user employer and the same position.
The division of OHS training between the agency and the user employer is described differently in commentaries, so it is set in the contract and according to the text of the act. The decision to skip training is taken by the plant's OHS specialist; the system provides the date and result, it does not release anyone from assessment.
Monthly introductory training hours with 10 people
Calculation: how many hours the plant loses
Example: a crew of 40 agency workers, of which 10 are replaced every month. Four of those ten are returning people, with a valid result on their account and the same workstation, which the OHS specialist considers not to require repeating the general training.
At 60 minutes of plant time per training, without a memory of the result, the monthly cost is 10 hours. With the result kept on the account, 6 hours remain, because the skip applies to four people. The gain is 4 hours a month, that is 48 hours a year.
What scale changes
With three agencies of similar rotation, the gain triples, to about 144 hours a year. With lower rotation, for example 5 people a month, the gain falls proportionally. The calculation is linear, so the plant can recalculate with its own values in a few minutes.
How the plant sets the process so the result is not lost
The task comes down to three rules. One account per person: the agency asks for an existing account to be assigned to a company, not for a new one. Confirmation of the assignment: so that a typo in a phone number does not attach someone else's account. A review of the result by OHS on each return of the person, before a repeat of the training is scheduled.
Sample calculation: rotation of 10 people a month
| Parameter | Value |
|---|---|
| Agency crew | 40 people |
| Monthly replacement | 10 people |
| Returning people with a valid result | 4 people per month |
| Plant time per training | 60 minutes |
Result: Without a memory of the result: 10 x 60 min = 10 h per month. With the result on the account: 6 x 60 min = 6 h. Difference: 4 h per month, 48 h a year, with three agencies about 144 h a year.
Note: Sample calculation based on own assumptions; it is not a measurement of a plant. The skip decision is made by the OHS specialist.
Video
Frequently asked questions
Can every returning worker skip introductory training?
No. The MPiPS position concerns re-employment of the same person by the same user employer in the same position. When the position changes, OHS decides.
What if the agency created a second account for the person?
The accounts can be merged, and the result moves to the active account, for up to three merges. The plant operator carries out the merge.
Does the system skip training on its own?
No. The system shows the date and result of the previous training, and the decision to skip or repeat it is taken by the OHS specialist.
Sources
Let us calculate rotation at your plant
Together with OHS we will recalculate repeated training for your agencies and show what a result kept on one account is worth.
Let's talk