Access schedule costs and gate refusals

Every refusal at the gate and every manual exception to the access schedule takes minutes from security, a planner and a supervisor. With 2,000 swipes per day, even 1 percent refusals means 20 events a day. Below is the cost structure and a sample calculation for a three-shift plant, which you can replace with your own figures.

154 h
per month on exceptions in the sample calculation
Source: sample calculation
-77 h
per month when refusals are halved
Source: sample calculation
4
components of the entry verdict
Source: security panel documentation

Where does the cost of an access schedule come from?

The access schedule itself costs nothing, but the exceptions do. Every deviation from the entry window requires someone's decision: security checks the list, calls the supervisor, notes the reason, and the planner corrects the roster so the situation does not repeat. For a plant with many work agencies, card traffic can exceed 2,000 swipes per working day, so even a low refusal rate creates a daily workload.

The costs fall into three groups: security time at the gate, the time of the supervisor or planner for decisions and roster changes, and the waiting time of the employee. The last group is the hardest to capture but the largest: a queue at the gate at the start of a shift delays the start of the line.

What makes up the entry verdict and what causes refusals?

The entry verdict in the security panel consists of four components: no missing training, no missing qualifications for hazardous work, a valid permit or a visit for today, and an active account. The first scan with a green verdict records an entry, the second an exit, and a scan with a red verdict records a refusal, which does not count as presence on the premises.

This means refusals have four sources and it is worth measuring them separately. In the monthly review, check which component accounts for the largest share: for work agencies it is usually a missing valid training, for guests a missing visit for today.

Hours on exceptions per month: before and after

Hours on exceptions per month: before and afterBefore and after chart: security 84 hours before and 42 after, supervisors and planners 70 hours before and 35 after.020406080100hoursBefore (Security): 84 hours84 hoursAfter (Security): 42 hours42 hoursSecurityBefore (Supervisors and planners): 70 hours70 hoursAfter (Supervisors and planners): 35 hours35 hoursSupervisors and planners
  • Before
  • After
Source: Sample calculation based on the assumptions in the Calculation section

Sample calculation for a three-shift plant

The assumptions below are illustrative and do not describe any specific plant. Replace them with your own data from the security review. The result shows an order of magnitude, not an offer.

  • Daily traffic: 2,000 swipes per working day.
  • Refusals and manual exceptions: 2 percent of swipes, that is 40 events per day.
  • Time to handle one exception by security: 6 minutes.
  • Time of the supervisor or planner for a decision and correction: 5 minutes per event.
  • Working days: 21 per month.

Step-by-step calculation

Security: 40 events times 6 minutes gives 240 minutes per day, that is 4 hours. Per month this is 84 hours. Supervisors and planners: 40 times 5 minutes gives 200 minutes per day, that is 3.3 hours, and about 70 hours per month. Together, about 154 hours per month, that is nearly two partial full-time equivalents.

If you limit refusals by half, by setting entry windows consistent with shifts and by reviewing overdue trainings before the start of a shift, the saving will be about 77 hours per month. At a rate of 50 PLN per hour (illustrative assumption), this gives about 3,850 PLN per month.

What reduces the cost: the schedule, the data or the process?

The biggest gain comes from improving the input data, not from tightening the rules. A refusal usually results from someone lacking a training, a permit or an active account, not from an error in the schedule. Reviewing the list of people with gaps before the shift is cheaper than handling refusals at the gate.

The second element is the entry windows: a window that is too narrow around a shift creates an avalanche of exceptions, one that is too wide weakens control. Test the window on one month of data and measure how many entries fall outside it without a substantive reason.

The third element is notifications: when a supervisor sees the queue of exceptions from the previous day, they close them in one batch in the morning, instead of handling them one by one by phone.

Cost structure of implementation and maintenance

The cost on the InnerWeb side covers the software licence and the integration with the existing ACS through the swipe webhook. InnerWeb does not produce or replace readers, so there are no ACS hardware costs in it. On the client side remain any work at the ACS supplier on schedules and reader directions.

Indicative ranges from 2025-2026 deployments; individual pricing. For ACS integration plan from several to a dozen or so working days of work by the IT team and the supplier, depending on the number of passages and swipe points. Maintenance means reviewing the entry windows once a quarter and handling changes to rosters.

Example calculation

Exceptions to the access schedule at a three-shift plant

Assumptions
ParameterValue
Swipes per working day2000 swipes
Share of refusals and exceptions2 %
Security handling time6 min per event
Supervisor or planner time5 min per event
Working days21 days per month
Illustrative rate50 PLN per hour

Result: About 154 hours per month; after halving the refusals, a saving of about 77 hours, that is about 3,850 PLN per month.

Note: Sample calculation based on illustrative assumptions; the result depends on the plant's data and is neither an offer nor a guarantee.

Video

Frequently asked questions

Is the access schedule a function of InnerWeb?

Entry windows are set in the access control system. InnerWeb adds the entry verdict from trainings, qualifications, permits and the account, and links swipes with attendance.

Does a refusal count as presence on the premises?

No. A scan with a red verdict records a refusal, which is not an entry and is not counted in the list of people on the premises.

What does integration with the existing ACS cost?

Indicative ranges from 2025-2026 deployments depend on the number of passages and the ACS supplier; individual pricing after a review of the passages.