Stojak ver4

Calibration kit

13.500,00  +VAT

The space calibration rack set is designed for professionals and companies specializing in creating advanced in-building navigation systems. By using it, the process of digitizing and mapping space becomes much simpler, faster and more precise.

Product Features:

  • High precision: The stand provides the stability and accuracy needed to calibrate indoor spaces, which is crucial for creating accurate and reliable navigation maps.
  • Ease of assembly: The rack structure is designed to make assembly and disassembly intuitive and can be done in a short time, without the need for specialized tools.

Application:

The bench will find application in a wide range of projects requiring precise calibration and mapping of indoor spaces, including:

  • Developing navigation applications for shopping malls, airports, hospitals and other large facilities.
  • Documentation of space for design and engineering purposes.

Provide your navigation projects with unparalleled accuracy and performance with our indoor surface calibration bench. Contact us today to learn more about how our solutions can support your business.