Constraints you have to deal with
The dialer calls one number at a time, and a single call with a speech synthesiser lasts roughly 25 to 33 seconds. The limit per slot restricts the number of calls, so that the run does not exceed the automat time limit. The content of the message directly affects how many people can be called within one slot.
The recipient is often standing in a hall or on a yard, hears machines and has nothing to write with. Every extra sentence lowers the chance that they hear what matters most. A voice message is not an e-mail read aloud.
Good practices for writing the content
Seven rules that work well for messages reminding about training.
First: start with the plant's name. The recipient must know at once who is calling. The sender of all system messages is the plant's name, and the system provider's name appears only in the footer, so the voice message should follow the same rule.
Second: one sentence about the reason, one about the action. Reason: the safety training required before entering the site has not been completed, or the account has not been activated. Action: click the link in the SMS message.
Third: for two groups, two different messages. Registered people without completed training are reminded about the training, and invitees with an inactive account are first asked to activate the account from the link in the SMS. Combining both in one text makes it longer and mixes the instructions.
Fourth: refer to the SMS that has already arrived. The SMS is stored on the phone, so the recipient can return to the link after the call ends. The message only says: open the SMS from the plant and click the link.
Fifth: do not read web addresses aloud. Writing down an address by ear is unreliable. The link belongs to the SMS, and the voice only indicates where to look for it.
Sixth: give a deadline only when it matters. If the training must be completed before entering the site, say so in one sentence. Additional dates are unnecessary baggage.
Seventh: end with one sentence about the effect of not acting, for example no access to the site, without scaremongering and without repeating it many times.
Number of words in the message against duration at a pace of 2 words per second
Example of content lasting about 25 seconds
Sample word count: at a speech synthesiser pace of about 2 words per second, the message fits into about 50 to 60 words for 25 to 30 seconds. Example for invitees with an inactive account: Good day, we are calling from the plant about the safety training. An active account is needed to enter the site. Please open the SMS from the plant and click the link. The training can be done on a phone. Thank you.
The pace assumption depends on the synthesiser used, and it is worth measuring it on a trial. A message that runs beyond 33 seconds should be shortened, not sped up.
Rules on the number of attempts
A person who answered the call on a given day does not receive another one. Morning slots are for up to three attempts to reach a person who does not answer. The message should therefore be built so that it works in one go, without assuming that a second call will follow.
Remember that a call to invitees makes sense only while the SMS link is alive, and the token is valid for 7 days. The message should not refer to a link that will soon expire. If the last day of validity is close, it is better to send the invitation again.
Checklist
Video
Frequently asked questions
How many words should the message have?
At a pace of about 2 words per second, 50 to 60 words gives 25 to 30 seconds. The pace depends on the synthesiser, so measure it on a trial.
Should the message give the link?
No. The link is in the SMS stored on the phone, and the voice says where to find it.
Is one text enough for all recipients?
No. For the two groups, registered people without training and invitees with an inactive account, two different messages are prepared.
Test your voice message
Together we will prepare two message texts and check their duration on a trial of calls.
Let's talk