InnerWeb
Skip to main content

Site survey and phone cascade before a stillness pilot

Transmitters can be placed perfectly, and the inactivity alarm still will not help if nobody knows who answers the phone at three in the morning. A site survey before the pilot starts confirms the transmitter placement and the list of people in the phone cascade, and only then is the start date set. Below are notes for the OHS manager on what to add to the list of agreed points.

50
transmitters verified at the pilot site survey
Source: pilot offer
PLN 1,350
pilot subscription, net per month
Source: offer, indicative ranges from 2025-2026 deployments; individual pricing

What the site survey confirms

Before a stillness pilot starts, a site survey takes place: confirmation of the transmitter placement and of the list of people in the phone cascade, then the start date. The order matters, because the start date depends on the completeness of both elements, not on the date the order was signed.

The pilot covers 50 transmitters, so their placement is verified on the site plan and on the ground. This is a technical task, but the most important part of the agreement is organizational: who will react to the alarm.

Who answers the phone

An inactivity alarm is information about a person who has not moved for a set time. The first recipient must be able to assess the situation immediately: call, check the last position on the map and decide whether to send help. In a plant working in shifts, the first recipient is usually the dispatcher or the shift manager, not the OHS manager, who is at home in the afternoon.

At the site survey, record for each shift the name and function of the first person, the deputy and the third person. Also establish what happens when nobody answers: whether the call passes to the next person after a set time, or another channel is activated.

Questions for the cascade list

Check each entry on the list with three questions: does the person have a current number in the system, do they have the authority to send help, are they available during their shift hours. A missing answer to any of them is a gap in the cascade.

Pilot subscription: monthly composition

Pilot subscription: monthly compositionChart of subscription components: server with 10 licenses PLN 800, maintenance of 50 transmitters PLN 350, rental of 2 watches PLN 2000200400600800PLN net/monthServer, 10 licenses: 800 PLN net/month800Server, 10 licensesMaintenance of 50 transmitters: 350 PLN net/month350Maintenance of 50transmittersRental of 2 watches: 200 PLN net/month200Rental of 2 watches
Source: Pilot offer for stillness detection; indicative ranges from 2025-2026 deployments; individual pricing

Who goes to the spot

Answering the phone is not enough. Someone must physically reach the person who is motionless, often in a distant part of the hall or on the yard. Establish who this is on each shift, what transport they will use and how long it takes. Measure the walking time from the most common duty point to the furthest work zone and record it in the site survey protocol.

If the travel time exceeds what the plant considers acceptable, do not change the stillness threshold, change the organization instead: assign an additional person closer to the zone or move the duty point.

Pitfalls at the site survey

The most common pitfall is a cascade list prepared once and not updated after staff changes. After a month half the people may be on leave or in another department. Assign an owner of the list and review dates, monthly during the pilot.

The second pitfall is confusing a technical test with an organizational test. The site survey ends before the pilot starts, but an alarm drill is worth running in the first days: a simulated stillness of one participant and a measurement of the time from the alarm to the answered phone.

  • Transmitters placed according to the site plan and confirmed on the ground.
  • A cascade list for each shift with numbers verified in the system.
  • The recorded walking time to the furthest work zone.
  • A designated owner of the list and the date of its monthly review.

Pilot costs and preparation

The one-off pilot deployment of lone worker protection costs PLN 9,400 net, and the subscription is PLN 1,350 net per month (indicative ranges from 2025-2026 deployments; individual pricing applies). Each day of delayed start caused by an incomplete cascade is a day of subscription with no effect. A site survey with a complete list brings this time down to zero.

Video

Frequently asked questions

What exactly does the site survey confirm?

The transmitter placement and the list of people in the phone cascade. The start date is set only after these two confirmations.

Who should answer the inactivity alarm?

The person who in a given shift can assess the situation and send help, usually the dispatcher or the shift manager. Name a deputy for each shift as well.

How often should the cascade list be updated?

Monthly during the pilot, and additionally after every staff change for positions on the list.

Prepare the site survey with us

We will send you a form for the site survey findings: transmitter placement, phone cascade and walking time. The OHS team will complete it before the pilot starts.

Let's talk