InnerWeb
Skip to main content

User notification preferences: best practices

Each user chooses separately which e-mail notifications they receive, but some messages cannot be silenced. The system administrator must therefore decide what is a choice and what is a requirement. Below are practices that preserve user convenience without the risk that a permit supervisor does not learn about a work stoppage.

3
configurable notifications: resumption, closing, new report
2
groups of non-switchable notifications: permit opening and work stoppage

Basic rule: no value means enabled

Each user chooses separately which e-mail notifications they receive. No value means enabled, so a configuration error does not silence the mailbox. This is a design decision worth repeating in your own procedures: when a setting does not exist, the message goes out by default.

For the administrator this rule is advantageous, because new notification types do not require a one-off action for every account. A user who has set nothing still receives the messages. Silencing is a conscious choice, not the effect of a gap.

Notifications that cannot be switched off

Safety-critical notifications cannot be switched off: opening of a permit and the paper version for key persons, and the work stoppage for everyone. A permit supervisor who is tired of e-mails therefore cannot silence the information about a work stoppage, and a key person cannot silence the opening of a permit.

Good practice: list the non-switchable notifications in the procedure and give the safety justification. Users look for workarounds less often when they understand why some messages must arrive.

Breakdown of notification types: configurable and non-switchable

Breakdown of notification types: configurable and non-switchableDonut chart: three configurable types and two non-switchable types.Configurable: 3 types (60%)Non-switchable: 2 types (40%)5typesConfigurable3 types (60%)Non-switchable2 types (40%)
Source: and: three configurable and two non-switchable groups

Configurable notifications

Resumption of work, closing of work and a new report are notifications the user can configure. For many people these are auxiliary information: useful on one day, tiring on another. Freedom of choice reduces noise and increases attention to critical messages.

Recommendation for the administrator: do not move configurable messages into the non-switchable category just to be safe. An overly long list of mandatory e-mails reduces their value.

The role of the person responsible for the area

The person responsible for an area has a single switch for work and reports in the area. A direct participant sets them per event. The difference is justified: the person responsible for the area needs the overall picture, so one switch is enough, while a participant wants to decide on a specific event.

In plants with many areas we recommend explaining this switch at the moment the responsible person role is assigned. A person who turns it off stops receiving both the work notifications and the reports from the area, which is a broader decision than it seems.

Procedure for the administrator

A good practice is a periodic review of settings: once a quarter we check who has switched off configurable notifications and whether there is a justification. The review does not interfere with the right to choose, but it helps notice people who may have silenced something by accident.

It is also worth adding a short section on preferences to the instructions for new users. It should contain the list of non-switchable notifications, the list of configurable ones and information on where to change them.

  • By default everything is enabled; switching off is a conscious move by the user.
  • List of non-switchable notifications: opening of a permit and the paper version for key persons, work stoppage for everyone.
  • List of configurable notifications: resumption, closing of work, new report.
  • One switch for the person responsible for the area, settings per event for the direct participant.

Checklist

Video

Frequently asked questions

Can a user silence the work stoppage?

No. The work stoppage is a safety-critical notification and goes to everyone.

What happens when a notification setting disappears from the configuration?

No value means enabled, so the message still goes out and a configuration error does not silence the mailbox.

Can the permit supervisor switch off the notification about its opening?

No, if they are a key person. The opening of a permit and the paper version for key persons cannot be switched off.

Set notification rules with us

We will show you the preferences screen and together decide what remains the user's choice and what is a safety requirement.

Let's talk