InnerWeb
Skip to main content

How many transmitters for a 5,000 m2 hall: cost and time

The procurement department estimating the budget needs one number: how many transmitters a hall of 5,000 m2 requires. In a building the rule is 1 transmitter per 100-200 m2, so a 5,000 m2 hall needs between 25 and 50 units. Below we set out what the result depends on and how long the map takes to prepare.

25-50
transmitters for a 5,000 m2 hall
Source: example calculation: 5000 m2 / 100-200 m2
approx. 100 m
spacing of transmitters on plant roads
Source: company fact sheet

The rule: 1 transmitter per 100-200 m2

In a building the design rule is 1 transmitter per 100-200 m2, and on plant roads one about every 100 m. The system works without GPS, because the position is calculated from signals of several transmitters and averaged on the map.

For a 5,000 m2 hall this gives a range of 25-50 transmitters. The lower bound corresponds to a density of 1 per 200 m2, the upper bound to 1 per 100 m2. This is an estimate for the budget, not a design: the final number is set after a survey of the hall.

What decides between 25 and 50 units

The density depends on how precisely the position of a person has to be indicated and on how built-up the hall is. High-bay racking, partition walls and large machines attenuate the signal, so in such places the plant chooses a denser layout.

The density also depends on the purpose. For a list of people present in the hall, a sparser layout is enough. To indicate the position of a person who is motionless or has pressed an SOS button, a density closer to 1 per 100 m2 is needed.

  • Open hall with few obstacles: closer to 1 per 200 m2.
  • Racking, walls and machines: closer to 1 per 100 m2.
  • Zones with higher risk: denser than the rest of the hall.
  • Roads around the hall: about every 100 m.

Number of transmitters for a 5,000 m2 hall by density (example)

Number of transmitters for a 5,000 m2 hall by density (example)Bar chart: 25 transmitters at 1 per 200 m2, 33 at 1 per 150 m2, 50 at 1 per 100 m2.01020304050pcs1 per 200 m2: 25 pcs25 pcs1 per 200 m21 per 150 m2: 33 pcs33 pcs1 per 150 m21 per 100 m2: 50 pcs50 pcs1 per 100 m2
Source: Example calculation: 5000 m2 divided by the area served by one transmitter

Example calculation of the number of transmitters

For a 5,000 m2 hall at 1 transmitter per 200 m2 you need 25 units, at 1 per 150 m2 about 33, and at 1 per 100 m2 50 units. The intermediate value of 150 m2 is a good point for a preliminary quotation until the hall has been surveyed.

The equipment cost depends on the unit price of the transmitter in an individual quotation. That is why the calculation gives the number of units, and the amount the plant receives after the survey and the choice of variant, including ATEX execution for zones 2/22 if the hall has them.

Time to prepare the map and the structure

Besides the equipment, the budget covers preparing the hall map and the location structure. The plant structure has five levels: plot, view (department), building, line and location. For a single hall, preparation rests on a plan that sets the outline of the building, the lines and the places to which risks will later be assigned.

The plan approved for migration is sometimes approximate, while machine points from an old 2D map are sometimes real positions. In one plant, 44 of 45 markers fell outside the area of their line after the plan was used instead of the map from the old system. That is why the source of the geometry is verified before the transmitters are placed.

What purchasing should include in the request

A quotation request should include the hall area, the type of building, zones with explosion risk, the required precision of position indication and the plan available. The InnerWeb industrial beacon has an industrial design registration, a CE declaration and ATEX execution for zones 2/22, so plants with such zones do not need separate devices for part of the hall.

Example calculation

Number of transmitters for a 5,000 m2 hall

Assumptions
ParameterValue
Hall area5000 m2
Lower density200 m2 per transmitter
Upper density100 m2 per transmitter
Plant roads100 m spacing

Result: 5000 / 200 = 25 units, 5000 / 100 = 50 units; the intermediate point 5000 / 150 = approx. 33 units.

Note: Example calculation; the final number is set by the survey of the hall. Prices: indicative ranges from 2025-2026 deployments; individual quotation.

Video

Frequently asked questions

How many transmitters does a 5,000 m2 hall need?

From 25 to 50 units, at 1 transmitter per 100-200 m2. The final number is set by the survey of the hall.

Does the system need GPS in the hall?

No. The system works without GPS, and the position is derived from signals of several transmitters averaged on the map.

Can the transmitters be used in explosion-hazard zones?

The InnerWeb industrial beacon has ATEX execution for zones 2/22. For other zones a separate analysis is needed.

Do you need the number of transmitters for your budget?

Send us the hall plan and a description of the building. We will prepare an estimate of the number of units and a schedule for the map.

Let's talk