Subcontractor Site Access Control: A Guide from Invitation to Exit

A subcontractor enters a plant correctly only if, at that very moment, four conditions are met: valid training, qualifications for permit-based work, a permit for today and an active account. This guide covers the whole flow: invitation, training before arrival, the gate, the stay on site and exit, with audit evidence at every stage.

4
conditions checked in one scan
24 h
window for flagging uncertain persons on the evacuation list
13 s
refresh interval of the list of people on site
Source: dokumentacja produktu

What a safe subcontractor entry depends on

A paper pass says only that someone once wrote a name on a list. It does not say whether the person completed training, whether their qualifications expired last month, or whether a permit exists today for a specific job. Security at the gatehouse usually has no tool that would answer these questions in a dozen seconds, so it checks what is visible: an ID card and yesterday's list.

Article 208 of the Polish Labour Code requires employers whose employees work in the same place to cooperate and appoint a coordinator. In an industrial plant this means one thing: the plant must know who is on its premises and on what basis. Entry control is the first and cheapest point at which that knowledge can be enforced. For entities covered by NIS2 there is a second reason: Article 21 of the directive lists supply chain security and access control among risk management measures.

Four entry conditions

In the InnerWeb solution, a QR code scan from a badge or a phone gives security a verdict based on four conditions. If any one is missing, entry is refused and the reason appears on screen, so the guard does not have to interpret anything or call the EHS department.

  • valid initial or periodic training,
  • qualifications required for permit-based work (for example, authorisation to work at height),
  • a work permit valid today,
  • an active account for the person in the system.

What the system does not do

The system does not control the gate or barrier, does not recognise faces and does not use NFC. The guard lets people in physically, while the system provides the verdict and the record. This boundary is deliberate: the decision to admit stays with a human, and the human receives information they did not have before.

Step by step: from invitation to exit

The sequence below works because each step closes one of the entry conditions before the person reaches the gate. The gate can then be handled in seconds rather than minutes.

Step 1: company register and named invitation

The plant enters the external company in the register, and the company's coordinator announces its employees. Each person receives a named invitation by e-mail or SMS. The coordinator sees only their own company, so they do not browse data of competitors or other crews.

Gate control makes sense only after the contractor register has been imported and badges assigned. This is a prerequisite, not an add-on: without it a scan will show no account.

Step 2: training before arrival

The contractor completes EHS training on a phone before travelling to the plant: a video or PDF, then a test with randomly selected questions. The plant sets the pass threshold in the panel. This way training does not block the gatehouse, and a foreman does not take it on behalf of the whole crew.

A person receives a message with a personal QR code only after completing the required training. The system does not send the code repeatedly, even when many events trigger sending. Training validity is controlled by expiry dates and a weekly report of gaps sent to designated persons.

Step 3: work permit or planned visit

A work permit in InnerWeb is an electronic document that moves through preparation, main work and closure phases. The system checks the dates and the qualifications of assigned workers when the permit is created and opened, and the plant has a live view of who is doing what work and where.

For people entering without work, for example for a meeting, a quotation or measurements, a planned visit is used. It replaces the permit requirement for one day, but does not remove the other conditions: training, qualifications and an active account still decide.

Step 4: badge or code on the phone

The badge QR code is random and not derived from a number or a date, so it contains no personal data. Revoking a badge issues a new one, and the history of previous ones stays in the system. The badge is printed from the security panel.

Step 5: scan at the gate

The first scan records entry, the second records exit. At entry security sees the verdict and any missing elements. When a person without valid training is scanned, the system creates an alarm and notifies the coordinator of their company. Calls about gaps are grouped: one call per company in a 55-minute window instead of one per employee.

Steps 6 and 7: stay on site and exit

Every scan goes into the entry and exit register. The same scans produce a list of people on site, divided into guests, couriers, suppliers, plant employees and external companies, as well as an evacuation list that can be printed with one click. Anyone who did not scan out goes to the group of uncertain persons and stays flagged there within a 24-hour window until the plant closes the case.

Entry control time at 60 people per day (example calculation)

Entry control time at 60 people per day (example calculation)Chart comparing 240 minutes of manual checking with 30 minutes of QR scan checking at 60 people per day050100150200250minManual check (Controller per day): 240 min240 minQR scan with verdict (Controller per day): 30 min30 minController per dayManual check (Morning peak, one gate): 240 min240 minQR scan with verdict (Morning peak, one gate): 30 min30 minMorning peak, one gate
  • Manual check
  • QR scan with verdict
Source: Example calculation: 60 people per day, 4 min manually versus 0.5 min with a scan

How long does check-in take: an example calculation

It is fair to note that in many plants manual checking of four conditions does not happen at all today: a document is checked and the name is written on a list. In that case a scan does not shorten an existing task, it adds a missing one, in under a minute. That is the right measure: not how many minutes were saved, but how many control items stopped being skipped.

  • Assumptions: 60 people from external companies enter daily through one gate, mostly in the morning peak.
  • Manual check-in: 4 min per person (comparison with the training list, checking the permit on paper or in a separate system, a call to the coordinator in case of doubt).
  • Check-in with a scan: 0.5 min per person (scan, reading the verdict, admission).
  • Result: 240 min of controller time per day with manual checking against 30 min with a scan; a difference of 3.5 h per day, or about 770 h per year over 220 working days.

Pitfalls that only show up at the gate

Most problems come not from technology but from data and roles. Four pitfalls repeat most often.

  • Missing training treated as a note in a report instead of a refusal of entry. Good practice is the opposite: no training means no entry at the gatehouse.
  • A contractor register imported only partially. People outside the register get a no-account result and security starts bypassing the system.
  • A permit issued for a building rather than for a machine. Entry control then lets the person in, but the plant still does not know where they actually work.
  • Exit not scanned. Without the discipline of the second scan, the list of people on site grows with people who left long ago, and the evacuation list loses credibility.

Evidence for an audit

An auditor, an inspector or an accident investigation team asks the same questions: who entered, when, on what basis and whether they had current training. Scan records, training status and permits provide evidence for an audit without assembling it from several sources after the fact. The system supports meeting the employer cooperation requirement of Article 208 of the Labour Code and the access control and supply chain requirements of Article 21 of NIS2, but it does not replace the plant's decisions or guarantee compliance with regulations.

Example calculation

Subcontractor check-in time at the gate

Assumptions
ParameterValue
People from external companies entering daily60 people
Manual check-in4 min/person
Check-in with QR scan0.5 min/person
Working days per year220 days

Result: 240 min versus 30 min per day: a difference of 3.5 h per day, about 770 h per year

Note: Example calculation based on the assumptions above; actual time depends on the number of gates, peaks and the quality of data in the register.

Video

Frequently asked questions

Does the system open the gate or barrier?

No. The system gives a verdict and records the scan, while the guard admits people physically. There is also no face recognition or NFC support.

What will security see when a contractor has no valid training?

A refusal with the reason on screen, meaning which of the four conditions is missing. The scan also creates an alarm and notifies the coordinator of the contractor's company.

Are guests without work also subject to control?

Yes. A planned visit replaces only the permit requirement for one day. Training, qualifications and an active account still decide on entry.

Where does the evacuation list come from?

From entry and exit scans at the gate. It refreshes every 13 seconds, and people with no recorded exit go to the group of uncertain persons.