Staffing agency card swipes without a reader template

In a plant that uses several staffing agencies, the missing OHS training alert worked only where a reader had a template defined in InnerWeb. All other swipes went to the log and warned nobody. A swipe audit showed that dozens of agency workers had no training. This case shows how to find that gap and close it.

2,000+
swipes per working day in a plant with many agencies
dozens
agency workers without training in one audit

The situation: many agencies, many readers

A manufacturing plant hired workers through several temporary staffing agencies. Card traffic in such a plant can exceed 2,000 swipes on a working day, and some people appear for a few weeks and then disappear. Each of them should hold a valid OHS induction training before entering the hall.

The access control system sent swipes to InnerWeb by webhook. From the security manager's point of view everything worked: swipes were visible, accounts were created, and the missing training alert appeared for people entering through the main gate.

The problem: the alert only covers locations with a template

The swipe location field distinguishes reader locations. The OHS training alert is raised only for swipe locations that have a template defined in InnerWeb. Readers in other locations raise no alert, and events from those places go to the log.

In this plant, some agencies directed workers to auxiliary entrances, and the readers at those entrances had no template. People without training passed through without any signal. In one audit, this concerned dozens of agency workers who swiped cards outside the main location and did not have the required training.

Nobody noticed, because a missing alert looks exactly like a missing problem. This is a classic case: silence in a system is not proof of health. It only proves that the system never asked.

Daily swipes covered by the training check, example

Daily swipes covered by the training check, exampleBefore and after chart: before adding templates, half of the 2,000 daily swipes go to the log only; after adding them, all are covered by the alert.0500100015002000swipes per dayBefore adding templates (Covered by the alert): 1000 swipes per day1000After adding templates (Covered by the alert): 2000 swipes per day2000Covered by the alertBefore adding templates (Log only): 1000 swipes per day1000After adding templates (Log only): 0 swipes per day0Log only
  • Before adding templates
  • After adding templates
Source: Example calculation: 2,000 swipes per day , illustrative assumption of 50% of swipes at locations without a template.

How to find the gap in an audit

The audit starts with the list of swipe locations that actually send events, not with the list of locations someone configured. The difference between these two lists is the gap.

The second step is to cross-check the swipes in the log with accounts that have no valid induction training. If the result is not empty and no alerts were raised, the swipe locations have no template.

  • export the list of unique swipe locations from the event log
  • compare it with the locations that have a template in InnerWeb
  • identify people with swipes in locations without a template and without valid training
  • group the result by agency to see where the problem is concentrated

How to close the gap: templates and ALL_EXCEPT mode

The fix has two steps. The first is adding a template for every reader that should be covered by the training requirement. The second is setting the training requirement itself in a mode that covers all companies except the listed exceptions (ALL_EXCEPT). This way, a new agency that appears at the plant is subject to the requirement from its first day, rather than being added to it manually later.

A training group can have versions in several languages, which matters for agencies that send foreign workers. Training that the person cannot understand is as real a problem as no training at all.

What about past swipes

Once the templates are added, the alert works from that moment on, and past swipes stay in the log. That is why the retrospective audit has to be done once, manually or with a script, and its result saved as evidence for the auditor. Each person on the list receives training, and the result is recorded on their account.

It is also worth checking whether the same people have a second account. When one person has two active accounts, the system transfers the training result to the account that holds the entry card, so the gate stops reporting missing training. It never merges accounts based on surname alone.

Video

Frequently asked questions

Why does a missing alert not mean that everyone has training?

The alert is raised only for swipe locations with a template. Events from the other readers go to the log without a training check.

Does ALL_EXCEPT mode cover new agencies automatically?

Yes. The requirement covers all companies except the listed exceptions, so a new agency is subject to it from its first swipe.

Can training be delivered in several languages?

Yes. A training group can have versions in several languages, which makes training foreign workers easier.

Check your swipe locations

Book a short call about a card swipe audit. We will show how to compare the locations in the log with the templates and find where the training alert stays silent.

Let's talk