For whom and why
These recommendations will help the purchasing department, which sets requirements for contractors, and reception, which deals every day with people without a company mailbox. Many plants have repair crews, drivers and subcontractors from micro firms who have no business address and are reluctant to give a private one.
An invitation can be sent without an e-mail address: one identifying data item is enough, namely an e-mail address, a phone number or a personnel number. As a result, a missing mailbox does not block entry, provided the plant takes care of a correct process.
Recommendations
Four recommendations, each with its justification.
First: know the consequences of the choice of data. The invitation channel results from what is provided. An e-mail address gives a full message. A phone number alone gives an SMS with a link. A personnel number alone sends nothing, and the activation link is handed over personally by the operator. Recommendation: define in the procedure which data is the minimum for a given group of contractors.
Second: prefer a phone number when there is no e-mail. A short SMS with a link reaches the person at once and allows the account to be activated without a mailbox. The link leads to the same screen as the long link from an e-mail, so the experience is the same.
Third: keep the personnel number for people without a phone and without a mailbox. In this variant the system sends nothing, so the operator, for example a receptionist, must personally hand over the activation link. The procedure should state who hands it over and how the handover is confirmed.
Fourth: rely on duplicate blocking. The system blocks duplicates of the e-mail address, phone number and personnel number, and normalises phone numbers to the E.164 format before comparison. The same number saved with spaces or with a country prefix will not create a second account.
How activation without a mailbox works
The short SMS with activation carries a link with a 16-character token, which leads to the same screen as the long link from an e-mail. The recipient does not yet have a session, which is why the short link must be publicly accessible in the security configuration. An automatic test checks this for every link sent to people without an account.
The SMS is sent as a message stored on the phone, not as a one-time flash message, because the recipient must be able to click the link again. For the contractor this is a practical difference: the message does not disappear after the screen is closed, and it can be returned to at the gate.
What about firms that have both an e-mail address and a phone
When the user has an e-mail address, the welcome message goes by e-mail and switches off the welcome SMS. The plant therefore does not pay for two channels for the same person, and the user does not receive duplicated information.
We recommend that purchasing include in the requirements for contractors a sentence about contact data: at least the phone number of the firm's coordinator. The coordinator later receives grouped notifications about missing trainings and invitations for their people.
Pitfalls
The first pitfall is foreign numbers saved without a prefix. Normalisation to the E.164 format works well when the number is complete, so reception should check the country prefix when entering it. The second pitfall is people with only a personnel number, who will never receive any message, because the system sends nothing to them. The third is shared phones: one person, one number, because duplicate blocking will not allow a second person to be registered on the same number.
- check the country prefix for foreign numbers
- appoint the person who hands the link to people with only a personnel number
- do not register two people on the same phone number
- test the short link from a phone without a session in the system
Video
Frequently asked questions
Can a contractor without a mailbox activate an account?
Yes, if they have a phone. They receive an SMS with a short link. Without a phone, the activation link is handed over personally by the operator.
Can the same phone number be entered twice?
No. The system blocks duplicates of phone number, e-mail and personnel number, and normalises numbers to the E.164 format before comparison.
Is the SMS duplicated with the e-mail?
No. When the user has an e-mail address, the welcome message goes by e-mail and switches off the welcome SMS.
Organise invitations for contractors
We will show you the invitation by phone and by personnel number, and agree with you the minimum data for each group of contractors.
Let's talk