Who these recommendations are for
These recommendations are addressed to the people who decide on the contractor: the plant director, the OHS manager, the security manager, the IT and OT departments and purchasing. We assume the plant is considering a rollout through an authorised partner, not directly with the manufacturer.
Our offer has two ways in: a direct conversation with the plant with a pilot lasting 3 to 6 months, or a rollout by an authorised partner in its region. Both lead to the same product. They differ in how the work is organised and how invoicing is done.
Seven recommendations
Each recommendation is described as: what to check and why it matters.
1. Check whether the partner is authorised by the manufacturer
An authorised partner deploys the technology in its region, while the manufacturer supplies the product, hardware, training and rollout support. Ask for confirmation of the status and for the name of the person on the manufacturer's side whom the partner works with. Without authorisation you cannot be sure the partner has access to support when a product problem occurs.
2. Require a three-contract structure
The partner model consists of a licence agreement with the manufacturer and a maintenance and implementation agreement with the partner. This split separates the software rights from the responsibility for the rollout and maintenance. A licence granted to the client directly by the manufacturer does not depend on how long the partnership with the partner lasts.
3. Compare the partner offer with the manufacturer price list
Prices in the manufacturer's offer are prices without the integrator's mark-up, and the mark-up is added on the partner side. A fair partner will explain what the mark-up consists of: engineering work, installation, training, maintenance. Indicative ranges from 2025-2026 rollouts are from PLN 12,600 to PLN 34,000 net, one-off, for a typical rollout; individual quotes apply.
4. Require an SLA with measurable times
The maintenance agreement should set reaction and repair times and availability of 99.5%. Sample SLA from the draft partner agreement: category A reaction 12 hours and repair 8 hours, category B reaction the next day and repair in 1 day, category C repair within 7 days, with the fee reduced by 1% for each hour of overrun.
5. Ask about local conditions and references
The partner knows the local plants and people, so a joint pilot shortens the path to trust in a new technology. Ask for a description of similar projects in other plants in the region, presented without disclosing the data of those clients.
6. Agree who is responsible for integration with existing systems
InnerWeb does not make or replace access control readers; it integrates with the client's existing access control system. The partner may be the installer of that system, which makes integration easier. Record in the contract who configures the connection through the API or webhooks.
7. Set the acceptance procedure
Pilot acceptance is based on explicit criteria, and after it a full rollout follows, with a one-off implementation cost and maintenance on subscription. Write down the criteria before signing the contract and attach them to it as an annex.
Manufacturer licence packages: net monthly cost
What to look at when assessing offers
Partner offers are often hard to compare because their scope differs. Put them into one table: licences, implementation, maintenance, training, optional modules, SLA. The manufacturer's licence packages serve as the reference point: the flexible variant at PLN 80 net per active user per month with a minimum of 10 users, or the fixed package of 50 licences for PLN 2,500 net per month, or 100 licences for PLN 4,000 net per month, as indicative ranges from 2025-2026 rollouts.
A licence is counted on active users, meaning accounts with at least one login in the month. Plant employees and the coordinators of external companies are counted; guests, employees of external companies and drivers are not. Ask the partner how it counted the number of licences in the offer.
Warning signs
Some answers from a partner should raise caution. A licence bundled with implementation, a refusal to show an SLA template or hidden mark-ups are signs to ask further or to consider a second offer.
- licence presented as part of the integrator's package without a separate agreement with the manufacturer
- no SLA template, or times without measurable thresholds
- no named person on the manufacturer's side
- offer without a description of who counts the active users
- a promise of full legal compliance instead of evidence for an audit
Video
Frequently asked questions
Can a partner sell licences at its own price?
Manufacturer prices are prices without the integrator's mark-up, and the mark-up is added on the partner side. During the pilot the partner also invoices the licences.
Who counts the active users?
A licence is counted on accounts with at least one login in the month. The counting rules should be written into the partner's offer.
Can the partner be changed during the contract?
Yes. The licence is granted to the client directly by the manufacturer and does not depend on how long the partnership with the partner lasts.
Let's choose a partner for your region
We will name an authorised partner and show a model of the contracts and the SLA. Book a call or a demo.
Let's talk