The situation: a continuous-operation plant and about 20 contractors
The plant produces insulation materials in continuous operation, with furnaces and production lines in two halls. Service work is carried out by about 20 contractor companies, and over the analyzed period of 9 weeks 106 work permits were issued. The four largest companies accounted for 63% of permits, and 82% of permits were issued between 6:00 and 10:00. In practice this means a morning peak at the gate, when several dozen people enter within a few hours.
Plant security is responsible for admitting people, but the decision to allow work belongs to EHS and maintenance managers. These two areas kept separate registers. The guard saw the notification list, but could not see whether a given person had valid training and a permit for today.
The problem: the verdict at the gate relied on memory and paper
The questions asked at the gate were simple, the answers hard to get: does the contractor have EHS training, qualifications for the work covered by the permit, does the permit apply today, and is the account active. Each of these conditions was in a different place. The result: a person could enter with valid training but without a permit for that day, or with a permit but with expired qualifications.
The second problem was the list of people on site. During an evacuation alarm the dispatcher had to reconstruct it from gatehouse notes and company lists. What matters in an evacuation is who is actually on the plant, not who was planned. The planned list and the actual list differ most often when someone left without scanning out or entered through another gate.
Permits by location indicated in the permit
The solution: a QR scan and four entry conditions
Security scans the QR code from the contractor's badge or phone. The first scan records entry, the second exit. At the moment of the scan the system checks four conditions: valid training, qualifications for the work covered by the permit, a permit for today and an active account. If any condition is missing, access is denied and the reason appears on the guard's screen. Security does not need to interpret the full permit view: it sees the verdict and the missing element.
The system does not control the turnstile or the barrier, does not recognize faces and does not use NFC. The guard lets people in physically, and the system provides the verdict and the record. This is a deliberate boundary: responsibility for admission stays with a human, and a register of entries and exits is created from every scan.
EHS training before entry, on the contractor's phone
Missing training does not have to mean turning back at the gate. The contractor receives an invitation by e-mail or SMS and completes the training on a phone: a film or PDF, followed by a test drawn from random questions. The pass mark is set in the panel. The company coordinator sees only their own company, and training validity comes back in a weekly report on gaps, sent to designated people.
The evacuation list from the same scans
The list of people on site is divided into visitors, couriers, suppliers, employees and outside companies. The evacuation list is built from the same scans and printed with one click. Anyone who did not scan out goes into the group "Uncertain", and the window for marking such people is 24 hours. This way the muster at the assembly point is compared with the actual list, not the planned one.
One view for security and EHS
A scan at the gate is both a security event and an EHS event, because it concerns admission to work. A rejected scan with the reason "no permit for today" is seen by security at the gate, and the same record is seen by the EHS coordinator. The security panel collects verdicts and missing elements, and the register of entries and exits is a shared source of truth for both departments.
The permit analysis also shows that 44 of 106 permits indicated a building instead of a specific machine. For security this meant not knowing exactly where the contractor was working. Improving the plant structure in the 3D map editor, so that the contractor selects a point at the machine rather than just the building, closes the gap between the gate and the workplace. The plant then saw two linked facts: who entered and where they are supposed to be.
Permits in the analyzed sample
The effect: what changed and how to measure it
The most important effect is a change in how the gatehouse works. Four conditions are checked at every scan, and missing training ends in a denial with a reason, not a note in a report. The evacuation list is available at any moment and does not require manual assembly. A weekly report on training gaps lets the plant close gaps before the morning shift.
The plant should measure three indicators: the share of rejected scans by cause, the number of people in the group "Uncertain" after the end of a shift, and the time from alarm to printing the list. The first indicator shows which companies have gaps, the second shows the discipline of scanning out, and the third supports evidence of the effectiveness of the evacuation procedure. These data serve as audit evidence for physical security and EHS.
Lessons for other plants
Access control makes sense only after the contractor register is imported and badges are assigned, so implementation starts with tidying company data, not with devices. When auditing a gatehouse, check whether the evacuation list is generated from actual entries and exits. If it is built from the planned list, it will be wrong when an alarm occurs.
For plants subject to NIS2 and the CER Directive this has additional significance: personnel security of external suppliers and access control are listed among the measures expected from critical entities. The scan register supports demonstrating that access control works in practice.
Video
Frequently asked questions
Does the system open the turnstile or the barrier?
No. The guard lets people in physically, and the system shows the verdict and records the entry. This keeps the admission decision with a human.
What happens when a contractor has no valid training?
The scan ends in a denial with the reason on the screen. The contractor can complete the training on a phone: a film or PDF and a test from random questions, with a pass mark set in the panel.
Where does the evacuation list come from?
From the same entry and exit scans. Printing takes one click, and people who did not scan out go into the group "Uncertain".
Where should implementation start?
With importing the contractor register and assigning badges. Without this, a scan has nothing to compare the person against.
Sources