InnerWeb
Skip to main content

Cost of running an open day for 100 guests: bulk invitations and QR labels

A plant open day means one hundred people arriving at a single gate within a few hours. With a paper list, the secretariat and security copy the data on the spot, and every missing entry lengthens the queue. With bulk invitations and QR labels, part of the work moves ahead of the event. Below is a sample calculation with explicit assumptions.

335 min
secretariat and security time recovered with 100 guests
Source: sample calculation
144
email addresses in one bulk invitation
Source: card

What does the work at an open day consist of?

Handling guests at an open day has three separate stages: preparing the list, registration at the gate and closing the day. In the paper model all three burden people at the same time, and the biggest peak falls in the last twenty minutes before opening.

Bulk invitations accept up to 144 email addresses pasted into a single request, with a preview before sending. The limit is 5 requests per 13 minutes per user, which is enough to send invitations to several hundred people in one secretariat session.

A bulk invitation does not create accounts: the person registers on their own. The secretariat therefore does not retype the data of dozens of people, and the plant does not keep accounts that will never be used.

Sample calculation for 100 guests

The assumptions are simple numbers that the administration department can replace with its own. Paper list: 3 minutes per guest at the gate, which means checking an ID and writing down the data, plus 1 minute per guest to transfer the list to a spreadsheet after the event. Together 4 minutes per person, or 400 minutes of work for 100 guests.

Bulk invitation model: pasting the addresses and reviewing the preview takes about 10 minutes for 100 addresses, printing the labels from the To print QR code list takes about 5 minutes, and handing out a label at the gate takes about half a minute per guest, or 50 minutes. Together 65 minutes. The difference is 335 minutes, or 5 hours and 35 minutes.

What is the To print QR code list?

It is the list of people who started training in the last 13 days and never had a printed label. It shows up to 89 entries and refreshes every 34 seconds. The secretariat prints labels for everyone on the list, instead of searching for them in a spreadsheet.

Calculation assumptions

The values below are sample assumptions, not measurements from a specific event.

  • 100 open day guests
  • paper: 3 minutes at the gate plus 1 minute of transfer, 400 minutes in total
  • QR: 10 minutes for invitations, 5 minutes for printing, 50 minutes for handing out, 65 minutes in total
  • difference: 335 minutes of secretariat and security work

Secretariat and security workload with 100 guests

Secretariat and security workload with 100 guestsBefore and after chart: 400 minutes with a paper list against 65 minutes with QR labels.0100200300400minPaper list: Work time: 400 min400 minPaper listInvitations and QR labels: Work time: 65 min65 minInvitations and QR labels
Source: Sample calculation based on the assumptions in the Calculation section

What changes at the gate?

Reception registers a guest by first name and last name, up to 20 and 30 characters, and a note of up to 64 characters. The account with its registration number and the QR label printout are created in a single transaction. A guest who did not register beforehand is therefore served in one step, not two.

For security the change is that the list of people present is built as it happens. There is no after-event stage of transcription, and in the event of an alarm the evacuation list is ready from the first scan.

Limits of the calculation

The times of 3 minutes, 10 minutes and half a minute are assumptions. A plant with a faster paper register will see a smaller difference, and a plant with a longer queue a larger one. We do not count the time spent guiding guests around, which is the same in both models.

We do not price the recovered time in zloty. The pay rate of secretariat and security staff is an internal matter for the plant. The licence for the system is priced individually, not as an amount tied to the number of guests.

Components of time in the QR label model

Components of time in the QR label modelBar chart: invitations 10 minutes, printing 5 minutes, handing out at the gate 50 minutes.01020304050minInvitations: 10 min10 minInvitationsLabel printing: 5 min5 minLabel printingHanding out at the gate: 50 min50 minHanding out at the gate
Source: Sample calculation
Example calculation

Handling 100 guests: paper versus invitations and QR labels

Assumptions
ParameterValue
Number of guests100 people
Paper: at the gate and transfer4 min per guest
QR: bulk invitations10 min in total
QR: printing labels5 min in total
QR: handing out at the gate0.5 min per guest

Result: Paper 400 minutes, QR 65 minutes, recovered 335 minutes, which is 5 hours and 35 minutes of secretariat and security work.

Note: Sample calculation. The times are assumptions to be replaced with measurements from your own plant.

Video

Frequently asked questions

Do guests need a phone?

No. The secretariat can attach a label printing request to the invitation, and the guest collects the label at the gate.

What if there are more than 144 invitations?

Invitations are sent in subsequent requests, within the limit of 5 requests per 13 minutes per user. For several hundred people one secretariat session is enough.

Does the system create accounts for everyone invited?

No. A bulk invitation does not create accounts, the person registers personally, so the plant does not keep accounts of people who do not come.

Plan an open day without a queue at the gate

We will show bulk invitations, the label printing list and registration at the gate, using an example from your event. Book a demo with the secretariat and the safety manager.

Let's talk