Starting point: induction as a bottleneck
The chemical plant belongs to an international group and runs refining and petrochemical operations. In maintenance it works with about 20 external contractors who carry out hot work, work at height and work inside tanks. Every month several dozen non-employees enter the site, including repair crews from firms of a dozen or so people and individual specialists.
Induction took place on site, at the gate, in the morning. The HSE duty officer ran it for the whole group and the foreman signed an attendance list. The effects were predictable: the crew waited, work started late, and after six months nobody could say with certainty whether every person on the crew had completed the training or only the foreman.
Why this goes beyond occupational safety
An essential entity under NIS2 is also responsible for supply chain security and for controlling access by third parties. When a contractor enters a site where process control installations operate, induction becomes part of a broader access policy. It does not settle compliance with the directive on its own, but it provides evidence that outside personnel learned the rules before they appeared at the installation.
Solution: induction before arrival
The plant moved induction to before arrival. The contractor's coordinator announces the workers in advance and the system creates named invitations. The invitation arrives by e-mail or SMS, or the participant joins on their own from a QR code. A single link handles account creation and access to the training, and the invitation register shows who was invited and how long they have gone without completing it.
The training consists of a video or PDF and a multiple-choice test. Questions are drawn at random from a pool, so two people sitting next to each other do not get the same set. After passing, the participant signs a declaration available in two language versions, and the result goes to the company record with an expiry date set by the plant.
Employees of external firms are not counted as licence users, so the number of people trained does not affect the cost of the system. The licence covers the plant's own staff and the coordinators of contractors who announce crews and submit requests.
- A named invitation (e-mail, SMS or QR code) instead of an attendance list.
- A test drawn at random from a question pool prepared by the plant.
- A declaration after passing, in two language versions.
- An expiry date set by the plant, for example 12 months, and an invitation to repeat the training once it lapses.
Time at entry for one non-employee
- Before: on-site induction
- After: QR result check
Suppliers, couriers and visitors: a separate path
Not everyone who drives onto the site is an employee of a contracted firm. A supplier, courier or visitor can complete the induction on their own, on a tablet at the gate. An account in the plant's parent company is not created anonymously: it requires an invitation or registration. As a result the self-service path is limited to temporary roles and does not open the way to an account in any company.
For a chemical plant this has practical value. A tanker driver does not have to wait for the HSE duty officer, and the officer does not lose the morning repeating the same briefing to a dozen people. The difference between a trained and an untrained person is visible at the gate immediately after the code is scanned.
Control at the gate and in the field
After rollout the gate stops being a place of training and becomes a place of control. Security scans a person's QR code and sees whether the induction is valid. The scan is not authentication in itself: the tablet shows whom the code belongs to and waits for confirmation, so one person cannot complete the training for another.
The same code is used in the field. Scanning a person's code shows their training, qualifications and today's permit. For particularly hazardous work (hot work, work at height, confined spaces) the digital permit checks at creation whether the assigned workers hold the required, valid qualifications. Gaps surface in the office before work begins, not at the workplace.
Language of the training
The language chosen at registration determines the language of the training. When material in that language is missing, the gate requires the training in Polish instead of skipping it. The plant does not promise training in every language: the scope depends on the materials it prepared itself.
Effect: an illustrative calculation of time at the gate
The calculation below is illustrative and shows the scale of the change; it is not a measurement from a specific installation. Assumptions: 60 non-employees per month, 25 minutes for on-site induction (on the crew's side), and after rollout a gate check of 3 minutes per person. The HSE officer's time spent on group training falls, and the crew starts work without waiting.
For one person this means 22 minutes less at entry. For 60 people a month that is 1,320 minutes, or 22 hours. The calculation does not include the cost of installation downtime during a delayed start of work, which in a process plant is often more significant than the labour hours alone.
Implementation cost at the scale of such a plant
The rollout covering the training module, work permits, QR control and the contractor record was completed in about 6 weeks. No additional infrastructure was required on the client side. For a plant of this scale the implementation cost fell in a range of roughly PLN 10,000–15,000 net, and monthly maintenance for about 10 plant users in a range of roughly PLN 1,500–2,500 net (indicative ranges from 2025–2026 deployments; individual quotation). The case deliberately did not include locating people: no beacons, wristbands or position tracking.
Lessons for plants with a similar profile
First, induction is easiest to take off the gate when every person has a named invitation. Second, a random-question test and a declaration provide more evidence than a list signed by the foreman. Third, it is worth linking the validity of the training to the work permit, because then control does not depend on the duty officer's memory. Fourth, the rollout can start with training and permits alone, and location can be added later on the same installation if the need arises.
Video
Frequently asked questions
Does a contractor's employee need an account in the plant's system?
Yes, but they create it with a single link from the invitation or from a QR code. An account in the plant's parent company is not created anonymously, it requires an invitation or registration.
Does every person on the crew complete the training separately?
Yes. The invitation is named, the test draws questions from a pool, and the result is stored against the specific person. The foreman cannot pass the training for the crew.
Does the rollout require beacons or position tracking?
No. In the case described the scope covered training, permits, QR control and the contractor record, without locating people.
Does the system guarantee NIS2 compliance?
No. It supports meeting the requirement on training and third-party access control and provides evidence for an audit.