InnerWeb
Skip to main content

Logo and branding of an OHS system instance: administrator good practices

The IT administrator can set the system logo separately for light and dark mode, and a separate login screen background. Below are practices that let you do this once and do it well, so the system looks consistent with the plant's identity.

2
modes with a separate logo and background
Source: feature card
8 MB
limit for an external company logo file
Source: feature card

What can be set

The administrator can upload a separate system logo for light and dark mode, and a separate login screen background for both modes. The editor is available in the system settings, in the Object tab, as a shortcut to the logo and background view.

In addition, each external company can have its own logo shown on the list of companies, instead of the generic building icon. It is a small detail that makes contractors easier to recognise on the list and improves readability for the person issuing permits.

Practices for the system logo

The two logotypes are two separate files, not one. A dark logo on a light background will not be readable in dark mode, so prepare a version with a light fill or an outline.

Prepare both versions before uploading

Obtain from the plant's or the group's marketing department a version for light backgrounds and one for dark backgrounds. If the group has a brand book, check the permitted variants there before changing the colours yourself.

Check both modes on screen

After uploading, switch between light and dark mode and review the login screen and the main view. Watch for background transparency and sharp edges.

Formats of the external company logo and the size limit

Formats of the external company logo and the size limitFive supported formats and an 8 MB size limit02468countSupported formatsSupported formats: 5 count5Size limit (MB)Size limit (MB): 8 count8
Source: Company Logo feature card

Practices for the login background

The login background is the first thing the worker sees. Choose a calm image, without small details behind the login field, so that the form fields remain readable in both modes.

Avoid photos of people if the plant has many external users. A neutral background or a photo of the hall without people requires no consents and raises no questions.

External company logos

An external company's logo accepts JPEG, PNG, GIF, WebP and SVG formats up to 8 MB, and is stored in the same file storage as other uploads. For readability of the list, a file much smaller than the limit is enough.

Decide who uploads the logos: the administrator, or the person responsible for contractors. If a contractor uploads the file itself, check it before it is published on the list.

Consistency with the group identity

At a plant belonging to a group, the instance branding is sometimes subject to head office approval. Before the pilot, agree whether the plant's logo or the group's logo is used, and who approves the change. This is one of the things that is better closed before launch than after the first user complaints.

Order of the branding settings in one pass

The practical sequence is this: first collect the files from the owner of the identity, then upload the logo and the background for light mode, then for dark mode, and finally review the login screen on a computer and on a tablet at the gate. This order keeps corrections to a single round.

If the plant has several contractors with a large share of the permits, add their logos at once, because a list with icons is easier to read for the person issuing permits. Remember the 8 MB limit and the supported formats.

After the change, record the date and the file name in the instance change log. The next time the identity changes, it will be clear what was uploaded and when.

Checklist

Video

Frequently asked questions

Can there be different logos in light and dark mode?

Yes, the administrator uploads a separate logo and a separate login background for both modes.

Where is the branding set?

In the system settings, in the Object tab, as a shortcut to the logo and background view.

Which external company logo formats are accepted?

JPEG, PNG, GIF, WebP and SVG up to 8 MB.

Match the look of the system

We will show the logo and login background settings on a demo instance and agree what to prepare on your side.

Let's talk