InnerWeb
Skip to main content

Customer auditors at the parts plant: an audit day scenario

At 7:30 a six-person team of customer auditors stands at the gate, and there are only half an hour before the first meeting. This scenario describes how to receive them without work permits, with a host, badges and an evacuation roll call. It is a concept for a parts supplier, not a description of a specific deployment.

13 s
refresh interval of the evacuation list
Source: card
45 min
manual list of people from three shifts
Source: illustrative calculation

Situation: a customer audit and six people to receive

An automotive parts supplier is subject to audits by its customers. The IATF 16949 standard describes the quality management system of the industry's supply chain, and the customer's auditor checks it on site: on the shop floor, in the warehouse, on the lines and in the documentation. Such a team usually arrives as several people and stays for the whole day or longer.

For the quality manager this visit matters for two reasons. First, the impression made in the first minutes at the gate sets the tone of the whole audit. Second, the plant has an obligation to know who is on its premises, including in the hall where machines run and forklifts move. A paper register at reception meets this requirement only in part, and it is hard to turn it into an evacuation list.

What is different from an ordinary external company

An auditor does not perform work in the sense of a permit: does not repair, weld or work at height. The auditor walks, talks, looks, photographs documentation and measures the time of the flow. Requiring a full work permit for such a person would be an artificial barrier and would generate paperwork with no value for safety.

A planned visit solves this problem in one place. For one day it replaces the requirement of a work permit at the gate for people who enter without work: for a talk, a valuation or measurements. Training, qualifications and an active account still decide whether someone may enter, so an auditor who has not completed the induction training does not get in just because the visit is planned.

  • a visit replaces a work permit for one day only
  • induction training and an active account remain conditions of entry
  • a person coming to do physical work still needs a permit
  • the visit has a host who is responsible for guests in the plant

Time to prepare the list of people on site

Time to prepare the list of people on siteBars: manual list of people 45 minutes, list from gate scans available at once, which is about zero minutes.01020304050minManual list: 45 min45 minManual listList from gate scans: 0 min0 minList from gate scans
Source: Illustrative calculation based on an example assumption: the list from scans is available at once

Audit day scenario hour by hour

A few days in advance the quality manager creates a planned visit and adds six people. The auditors receive an invitation in which they choose a language and complete the induction training. Suppliers, couriers and guests can join on their own and take the training on a tablet; if the training does not exist in the chosen language, the gate requires the Polish version instead of skipping the step.

On the audit day the system shows the verdict at the gate: valid training, qualifications, permit in progress and an active account. An auditor with a planned visit and valid training walks in. At the first entry of a guest on the day of the visit, the system calls the host once, without retries, so the host knows the team is already on site and can pick them up.

Badges and the assembly point

Each auditor receives a badge with a QR code, and the scan at the entrance records a gate entry. In this way guests appear at once on the evacuation list and in the view of people on site. Recording the entry or exit of a guest in the panel also records a gate entry, so reception can complete the data by hand without disturbing the list.

Exit and closing the day

After the audit, the scan at the exit closes the attendance. The quality manager has a ready summary of who, when and with which host was in the plant, which is a document for the plant's own audit files.

Roll call on the audit day

The evacuation list is built from QR scans at the gate and refreshes every 13 seconds. People are divided into six groups: guests, couriers, suppliers, plant employees, external companies (with tabs per company) and uncertain. Auditors belong to the guest group, so in an alarm the evacuation view shows them separately, together with their assigned host.

Illustrative calculation: preparing by hand a list of people on site from three shifts takes security about 45 minutes, while the list from the gate scans is available at once. On the audit day, when the guest team enters and leaves several times, the saving applies not only to the evacuation but also to the auditor's question of who worked on a given line.

What to watch in the preparation

The most common mistake is the assumption that a planned visit releases everything. It releases only from the work permit, not from training and the account. The second mistake is a host without a phone number in the system: the notification then has no addressee.

The third mistake concerns language. An auditor from another country expects training in their own language. When it is missing, the system will enforce the Polish version, so before the audit it is worth checking in which languages the plant has prepared induction training. In this way the morning does not turn into translating instructions at the gate.

Video

Frequently asked questions

Does an auditor need a work permit?

No, if they enter without physical work. A planned visit replaces the requirement of a work permit for one day, but training, qualifications and an active account still decide whether they may enter.

Who is responsible for auditors on site?

The host of the visit named in the invitation. The system calls them once, at the first entry of a guest on the day of the visit.

Will a foreign auditor take training in their own language?

Yes, if the plant has prepared the training in that language. When it is missing, the gate requires training in Polish.

Where can auditors be seen in an evacuation?

On the evacuation list in the guest group. The list is built from QR scans and refreshes every 13 seconds.

Sources

Prepare the plant for audit day

Let us talk about receiving audit guests without paper at reception. We will show the planned visit, badges and the roll call using an example of a plant like yours.

Let's talk