What Art. 226 of the Labour Code Actually Requires
The provision covers three things. First, the employer assesses and documents the occupational risk related to the work performed and applies the necessary preventive measures that reduce this risk. Second, the employer informs employees about the occupational risk linked to their work and about the rules of protection against hazards. Third, the assessment covers all workstations, not only those associated with heavy industry.
In an inspection, three questions from the inspector matter: does the assessment exist in writing, does it reflect real working conditions today and not those of five years ago, and does the employee know what threatens them and how to stay protected. An assessment that sits in a binder and was not changed after a technology change meets the first condition and fails the others.
Step 1: Inventory of Workstations, Activities and Places
Start with a list, not a form. List the workstations, the activities performed at each of them and the places where work takes place: hall, line, tank, warehouse, roof, plant road. Record periodic work and work contracted to external companies separately, because these are the items most often left out of the assessment.
A good inventory comes from a walk-through with employees, not from a desk. A person who has operated a machine for years will point out hazards that are not in the instruction: a slippery passage after washing, an obscured emergency stop point, noise from the neighbouring line.
Example distribution of 40 hazards before and after measures
- Before measures
- After measures
Step 2: Hazard Identification
For each activity ask: what can cause harm and how. Group hazards by factor: mechanical, electrical, chemical, fire and explosion, physical (noise, vibration, temperature), ergonomic, psychosocial, and hazards arising from work organisation, such as lone work or shift work.
Walk-throughs are not the only source of hazards. Near-miss reports, accident reports, workplace measurement results and comments from the maintenance team are also useful.
- Accidents and near misses from recent years
- Safety data sheets and workstation instructions
- Results of tests and measurements of harmful factors
- Employee reports and comments from the employee safety representative
Step 3: Risk Estimation
Risk is estimated with a method that the plant selects and applies consistently. The most common are a probability and consequence matrix on a scale from 1 to 5, or a three-factor method in which exposure time is added to probability and severity. The provision does not impose a single method; it requires that the assessment be reliable and repeatable.
Two people assessing the same workstation should reach a similar result. That is why you should describe the scale in words: what probability 3 means and what consequence 4 means, with examples from your own plant. Without such descriptions, assessments diverge between departments and the register loses its comparative value.
Step 4: Preventive Measures and Their Owners
For risks above the acceptability threshold, select measures in the order known from the hierarchy of controls: eliminating the hazard, technical solutions, organisational solutions, and personal protective equipment last. A measure without a responsible person and a deadline remains a declaration.
Every risk should have an owner, meaning someone responsible for its level after the measures are implemented. In an industrial plant this is often the department manager, not the health and safety department. Health and safety advises and verifies, while decisions about changing work organisation are made on the line.
Step 5: Informing Employees
The duty to inform under Art. 226 applies to every employee and every shift. The information must arrive before work starts, not after the fact. In plants where subcontractors also work, remember Art. 208 of the Labour Code and the mutual exchange of information about hazards between employers operating in the same place.
The employee sees the risks and required protective measures before starting work: InnerWeb shows them in the work permit and in the map editor, and risks are assigned to locations at every level of the plant hierarchy and to the type of hazardous work through the catalogue of risks and protective measures. On the printed permit, risks are arranged in five sections without repetition, which makes them easier to read at the workstation.
Step 6: Evidence and Review
An assessment is documented so that it can be shown and updated. Record the date, the author, the method used, the result before and after the measures and the reason for each change. Who changed the assessment and when should be evident from the history, not from people's memory.
The system records who changed a permit, training results or an automation rule, and when, through the audit trail of changes. The audit trail helps with disputes over a permit, with inspections and with accident investigation. The list of audited objects is explicit and covers human actions, not machine records. This provides evidence for audit, but it does not replace the decisions of the people carrying out the assessment.
Trigger a review of the assessment with events: an accident, a near miss, a technology change, a new substance, a new contractor, a change in hall layout. A calendar review once a year is a supplement, not a substitute.
The Most Common Mistakes
The same mistakes recur in almost every plant. The list below lets you check your own documentation in one afternoon.
- An assessment prepared once and never updated after changes on the hall
- One assessment for many different workstations, with no distinction between activities
- No assessment of work contracted to external companies
- Preventive measures without an owner and a deadline
- An employee cannot say which risks apply to their workstation
- A risk scale without descriptions, so results depend on the assessor
Checklist
Video
Frequently asked questions
Is occupational risk assessment mandatory in every company?
Yes. Art. 226 of the Polish Labour Code applies to every employer, regardless of size and industry. The scope and level of detail depend on the type of work and the level of hazards.
How often must the assessment be updated?
The provision sets no fixed deadline. The assessment must reflect real working conditions, so you update it after an accident, a technology change, the introduction of a new substance or a change in work organisation.
Does an IT system replace risk assessment?
No. The system organises the risk catalogue, assigns risks to locations and work, and records the history of changes. The assessment is carried out and approved by people.
Sources
See the Risk Catalogue in Action
Book a short demo and see how risks assigned to locations and work flow into the permit and onto the printout.
Let's talk