What changed on 3 April 2026
The Act of 23 January 2026 amending the National Cybersecurity System Act (Journal of Laws 2026, item 252) implements the NIS2 Directive (EU) 2022/2555 into Polish law. It was published in the Journal of Laws on 2 March 2026 and entered into force a month later, on 3 April 2026. For water utilities this means the end of the period when NIS2 was a conference topic: the clock of the transitional provisions has started running.
Drinking water and waste water belong to the sectors of high criticality in Annex I of the directive. A plant that meets the size thresholds is therefore a candidate for essential or important entity. Self-identification decides who it is, not a decision of an authority: the Act assumes that the entity assesses its own status and submits its own application. Existing operators of essential services were entered in the register ex officio.
Three dates that organise the plan
According to the schedule card: 3 April 2027 is the end of 12 months for the Chapter 3 obligations (Article 33(1)), 3 April 2028 is the end of 24 months to the first audit of an essential entity (Article 33(2)), and fines under Article 73(1)–(4) and Articles 73a–73c can be imposed for the first time after 3 April 2028 (Article 35). The most serious infringements, meaning a direct and serious cyber threat to human life and health, carry a fine of up to PLN 100 million (Article 73(5)) and do not benefit from this period.
Step 1: self-identification of the plant
The first document is a short decision note: sector (drinking water, waste water, waste management), size (headcount, turnover, balance sheet total) and a conclusion on whether the plant is an essential entity, an important entity or outside the scope. Thresholds from the regulatory card: an essential entity is a large entity in a sector of high criticality (from 250 employees, or turnover above EUR 50 million and balance sheet above EUR 43 million); an important entity is a medium-sized entity in a sector of high criticality (50–249 employees, or turnover up to EUR 50 million, or balance sheet EUR 10–43 million).
In municipal water utilities, size is counted for the legal entity that provides the service, not for the municipality as owner. For companies with capital links you must analyse whether data from related entities add up to the thresholds. The note is signed by the head of the entity, because they are responsible for decisions about the management system.
NIS2 implementation window from the Act's entry into force
Step 2: the register application
The application is submitted electronically, and the deadline depends on the schedule in the Minister of Digital Affairs' notice for the given category of entity (Article 34(3)). Secondary sources give 3 October 2026 as the cut-off date for some entities, so check the notice for your category and do not rely on what you remember from a conference. A change of data in the entry is reported within 14 days of the change.
In the same step designate at least two people to contact the bodies of the national cybersecurity system, and set up a way for service users to report cyber threats. For a water utility a sensible choice is one person from IT and one from OT maintenance, so that reporting does not depend on one person's leave.
Step 3: the information security management system
Chapter 3 of the Act requires a system covering a risk estimation policy, asset analysis, ICT supply chain security, continuous monitoring, identification of cyber threats, staff training and incident response procedures. In water utilities the core of this system is an inventory of OT assets: PLC controllers, HMI panels, modems and routers in treatment plants, pumping stations and at the wastewater treatment works.
A practical order: inventory of assets and remote connections, risk assessment for critical processes (abstraction, treatment, pumping, wastewater intake), remote access policy, a continuity plan with a manual operation mode, an incident procedure with contacts to the CSIRT. The IEC 62443 standards (zones, conduits, SL 1–4 levels), ISO 27001:2022 and ISO 22301 form the skeleton of the evidence. A certificate does not mean compliance with NIS2, but it makes it easier to demonstrate systematic work.
Step 4: incident reporting and the role of management
A significant incident is reported through the S46 system to the competent CSIRT in three stages: an early warning without undue delay and no later than 24 hours after detection, an incident notification within 72 hours and a final report within a month of the notification. The procedure must state who at the treatment plant judges that an event is significant, and who reports at three in the morning.
The head of the entity oversees the system, plans funds and completes mandatory annual cybersecurity training. The regulatory card describes a personal penalty for the head of up to 300% of remuneration calculated like a holiday-pay equivalent (public entities: up to 100%), Article 73a. A board that approves the security budget and minutes the risk review builds its own evidence of due diligence.
Step 5: audit evidence and the window to 2028
The first audit of an essential entity falls 24 months after the Act enters into force and is then repeated at least once every 3 years. The auditor looks for evidence of operation, not declarations: an asset register with an update date, a list of accounts with permissions, a record of the remote access review, a training record, a manual mode exercise and the history of reported events.
InnerWeb is a producer of software that supports this evidence on the side of people and contractors: an electronic permit defines the task, place and time window of an external company's work, and recorded changes with author and time create an audit trail. The system does not replace OT network safeguards; it complements them with an independent register of who worked at the site, where and on what basis.
Checklist
Video
Frequently asked questions
Does every water utility fall under NIS2?
Not every one. Sector and size count: small entities are as a rule outside the scope, medium-sized ones are important entities, large ones are essential. Exceptions apply to selected categories regardless of size, so self-identification must be documented.
By when must the information security management system be in place?
The Chapter 3 obligations must be met by 3 April 2027 for entities that met the criteria on the day the Act entered into force. A new entity counts its own deadline from the moment it meets the criteria.
Is ISO 27001 enough?
It does not replace the requirements of the Act, but it is a good skeleton for evidence. For OT networks you also need IEC 62443, and for continuity ISO 22301.
Who reports an incident to the CSIRT?
The entity that detected the significant incident, through the S46 system. The internal procedure should name an on-duty person and a deputy, because the early warning must be sent within 24 hours of detection.