A chemical plant assesses its NIS2 essential entity status: a case

A chemical plant with about 2,000 employees and about 20 external maintenance firms had to decide in 2026 whether it is an essential or an important entity. The difference is a maximum penalty of EUR 10 million versus EUR 7 million and a mandatory audit, so the assessment took the team several weeks, not one afternoon.

about 2,000
employees in the generic case
Source: generic case
EUR 18 million
penalty limit for an essential entity at revenue of EUR 900 million
Source: illustrative calculation
EUR 12.6 million
penalty limit for an important entity at the same revenue
Source: illustrative calculation
about 6 weeks
to launch the training, permit, control path

Starting point

The case is generic and does not describe one specific entity. The chemical plant belongs to an international group, employs about 2,000 people and runs two main lines of activity: the manufacture of chemicals, and refining and petrochemical installations. About 20 external firms work in maintenance and every month bring several dozen non-employees onto the site, often for hot work, work at height and work inside tanks.

After the amendment of the Polish National Cybersecurity System Act (KSC) entered into force (3 April 2026, Journal of Laws 2026, item 252), the board asked one question: is the plant an essential or an important entity, and what follows from that. The answer was to go into a memo approved by the head of the entity, because he or she is responsible for oversight of the information security management system.

The problem: two activities, two annexes

The manufacture of chemicals falls within an important sector (Annex II of the NIS2 Directive). With 2,000 employees the size threshold is met with a wide margin, so for this activity the plant is at least an important entity. For essential status the decisive question was whether any of the activities falls within an essential sector, for example energy, including the refining and processing of crude oil.

The team concluded that the refining and petrochemical installations should be assessed separately, with a legal assessment referring to Annex I. When one of the activities falls within an essential sector and the entity is large (from 250 employees), essential status follows from the thresholds alone. The second thread is the boundary: whether affiliated companies in the group count towards headcount and turnover. In this case the thresholds were met so clearly that a dispute over the method of counting did not change the result.

Upper penalty limit at revenue of EUR 900 million

Upper penalty limit at revenue of EUR 900 millionChart comparing the upper penalty limit: EUR 12.6 million for an important entity and EUR 18 million for an essential entity at revenue of EUR 900 million.05101520EUR millionImportant entity (1.4%): 12.6 EUR million12.6Important entity (1.4%)Essential entity (2%): 18 EUR million18Essential entity (2%)
Source: Illustrative calculation: revenue EUR 900 million; thresholds of 2% and 1.4% and amounts of EUR 10 and 7 million from

The solution: an assessment path in four steps

A team from process safety, legal and IT/OT carried out the assessment in a fixed order. Each step ended with an entry in the memo, which later serves as audit evidence.

  • Inventory of activities: all production lines, energy installations and services provided externally, assigned to Annexes I and II.
  • Size test: employment and turnover from the last financial year compared with the thresholds of 250 employees, EUR 50 million turnover and EUR 43 million balance sheet.
  • Checking categories independent of size and any former status as an operator of essential services under the previous Act.
  • An application for entry on the register in line with the timetable in the Minister of Digital Affairs' announcement, and appointing a person who reports any change to the entry within 14 days.

Illustrative calculation: what the difference in status means

So that the board could see the scale, the team calculated the maximum penalty for one annual revenue figure. The assumption is illustrative: revenue in the previous financial year of EUR 900 million. According to the amended Polish National Cybersecurity System Act (Journal of Laws 2026, item 252), an essential entity is subject to a penalty of up to EUR 10,000,000 or 2% of revenue (the higher amount applies), and an important entity up to EUR 7,000,000 or 1.4% of revenue.

For an essential entity, 2% of EUR 900 million is EUR 18 million, so the percentage value is higher. For an important entity, 1.4% of EUR 900 million is EUR 12.6 million, also higher than EUR 7 million. Both values are an upper limit, not a forecast of a penalty. The penalties under Article 73(1)–(4) can be imposed for the first time from 3 April 2028, with the exception of the most serious infringements.

What this calculation does not show

It does not include the personal penalty of the head of the entity (up to 300% of remuneration calculated like a holiday-leave equivalent, Article 73a), or the cost of downtime or loss of customer trust. It shows only that in a plant of this scale both statuses mean amounts of the order of a dozen or more million euro, not a symbolic fee.

The contractor thread in risk assessment

The status assessment exposed an area that the plant had treated as an OHS matter rather than a cybersecurity one: access of external firms to installations. The information security management system covers ICT supply chain security and staff training, and the actual state of affairs was as follows: permits in binders, no current picture of open work, induction only at the gate and validity of qualifications monitored by hand.

The plant introduced a path in which training, permit and control form one chain. A named invitation with a QR code is sent by e-mail or SMS, online training with a test takes place before arrival in two language versions, and when a permit is created InnerWeb automatically checks the validity of the qualifications of the assigned people. A QR code check in the field shows the training, qualifications and today's permit. Go-live took about 6 weeks and required no additional infrastructure on the client side.

Effect and cost

The effect for the NIS2 assessment is twofold. First, the plant has a status memo with reasoning, approved by the head of the entity. Second, it has a record of who was trained and when, who issued a permit and who changed it, which provides audit evidence in the area of the supply chain and training. These records support meeting the requirement, but they do not replace risk analysis or the other elements of the information security management system.

The cost of such a rollout is of the order of PLN 10,000–20,000 net one-off plus several thousand zlotys a month for maintenance (indicative ranges from 2025–2026 deployments; individual quotation). Against penalties of the order of a dozen or more million euro this is a marginal item, but it is not the total cost of NIS2 compliance.

Lessons for similar plants

Status is assessed by activity, not by the name of the company: a chemical plant can be an important entity because of chemicals and an essential one because of energy installations. The assessment must be recorded, approved at the level of the head of the entity and refreshed when things change. The contractor thread is worth including in the information security management system from the start, because that is where evidence is most often missing.

Video

Frequently asked questions

Are 2,000 employees enough for a chemical plant to be an essential entity?

Size alone is not enough. Chemicals manufacturing falls within an important sector, so the plant is an important entity, unless another of its activities belongs to an essential sector or a category independent of size applies.

Why is the percentage value higher in the calculation, not the flat amount?

The provision requires the higher amount to be applied. At revenue of EUR 900 million the percentage value (2% or 1.4%) exceeds the amounts of EUR 10 million and EUR 7 million.

Do external firms have to be included in the status memo?

Not in the status memo itself, but in the risk analysis of the information security management system, because that system covers supply chain security and staff training.