What the migration budget consists of
The most common budgeting mistake is counting only the cards. Cards are the largest item by number of units, but rarely the largest by amount. The total is decided by the readers, which must handle encrypted cards, and by the work on keys and encoding.
All amounts in this text are indicative ranges from 2025-2026 projects; individual pricing applies. We do not assign them to any specific entity, and we state the calculation assumptions openly so you can replace them with your own.
- Encrypted cards: an item priced per unit, with a reserve for lost cards.
- Readers: only where the existing ones do not support encrypted cards.
- Key design, encoding and assignment of employee identifiers.
- Supplementary software: integration of events with qualifications, permits and attendance.
What concerns the software and what concerns the readers
InnerWeb is a software vendor: we do not produce or replace access control readers or cards. If the migration requires new readers, you buy them from the vendor of your access system. Our part is receiving card punch events through a webhook and linking them with qualifications, permits, attendance and RCP.
In practice, when the card technology changes, the integration on our side usually stays the same, provided the access system still sends the same event with the person's identifier. It is worth writing this into the requirements for the vendor: the event format must remain unchanged after the migration.
Structure of migration costs, midpoint of ranges
Sample calculation for 800 people
We assume a plant with 800 employees, card replacement for everyone, 30 readers to be replaced, and a key design carried out once for the whole plant. The figures below are calculation assumptions, not an offer.
Cards and reserve
We assume a range of 15-35 PLN per card, for 800 pieces plus a reserve for lost cards. The midpoint gives 20,000 PLN. The reserve is calculated separately as a few percent of the batch.
Readers and key design
For 30 readers we assume a range of 800-2,000 PLN per unit, with a midpoint of 42,000 PLN. Key design, encoding and documentation: 8,000-20,000 PLN, with a midpoint of 14,000 PLN.
How to reduce the cost without reducing security
The largest savings come from phasing: readers are replaced first where the risk is highest, and old cards work in parallel until the migration is complete. This requires readers that support both technologies during the transition.
The second source of savings is order in the data: the fewer inactive accounts and cards in the system, the fewer cards to issue. Before ordering a batch, it is worth agreeing the list of people with HR.
What typical quotations leave out
Tender requests often omit the cost of withdrawing old cards, the cost of training security staff and integration tests on the supplementary systems. These three items are often left out and come back as costs after go-live.
- Withdrawal and disposal of old cards.
- Security staff training on the new lost-card procedure.
- Integration tests of punch events after the readers are changed.
Migration of 800 people to encrypted cards
| Parameter | Value |
|---|---|
| Number of cards | 800 pieces |
| Card price range | 15-35 PLN/pc |
| Readers to replace | 30 pieces |
| Reader price range | 800-2,000 PLN/pc |
| Key design and encoding | 8,000-20,000 PLN one-off |
Result: Sum of midpoints: approx. 76,000 PLN (cards 20,000, readers 42,000, keys 14,000). Full ranges: approx. 44,000-118,000 PLN.
Note: Sample calculation. Indicative ranges from 2025-2026 projects; individual pricing applies. Hardware items are priced by the access system vendor.
Video
Frequently asked questions
Does InnerWeb charge extra for a change of card technology?
The integration of punch events usually stays the same, provided the access system sends the same event. The scope is checked during individual pricing.
Do all readers have to be replaced?
Only those that do not support encrypted cards. Some readers work in both technologies, which allows the migration to be phased.
Is the sample calculation an offer?
No. These are indicative ranges with stated assumptions, which can be replaced with your own figures.