LOTO energy isolation: a step-by-step guide

Energy isolation means cutting equipment or an installation off from every energy source and securing that state so that nobody can change it while work is under way. In practice it comes down to six steps, from identifying the sources to verifying zero energy. Below is each step, the typical mistakes and a way of recording the work that gives you audit evidence.

What energy isolation is and where LOTO comes from

LOTO stands for lockout/tagout. It means physically securing an energy-isolating device (a switch, disconnector or valve) with a padlock and a tag, so that it cannot be moved by accident or on purpose while a person is working. Simply switching a machine off with a button is not energy isolation: someone else can start the drive, and energy stored in a spring, a capacitor, a compressed-air receiver or a vertical section of pipe can still cause movement.

In Polish plants the same idea appears under several names: preparing the workplace, de-energising, securing against re-energisation, and in the power industry the switching and safeguarding sheet. General regulations require the employer to assess risk and provide safe working conditions at machinery and equipment, including protection against unintended start-up. How a plant meets that requirement is described in its own procedure, and it is that procedure and its execution that get assessed after an incident or during an inspection.

Six steps of energy isolation

The sequence below is a working template. In your plant the number and names of the steps may differ, but each step needs an owner, an order and a record. If the procedure has gaps, a digital system will not fill them: it reproduces what is in the procedure.

Step 1. Identify all energy sources

Before anyone touches a switch, the person preparing the job lists the energy sources for the equipment: electrical, hydraulic, pneumatic, thermal, gravitational, chemical, and energy stored in springs or vessels. The most common mistake is to consider only the electrical supply because it is the most visible. The basis is the process or electrical diagram, not the operator's memory.

Step 2. Shut down and disconnect

The equipment is stopped in normal mode, and then every identified source is cut off with the appropriate isolating device. The shutdown order follows from the process: in a process installation, closing the flow before stopping the pump has different consequences than the reverse. The person performing the step records which isolating device was used and at what time.

Step 3. Secure against re-energisation

This is the actual LOTO moment: a personal padlock and a tag with the person's details and the date are placed on every isolating device. Where several people work, a group lockbox is used, as described in our guide to good lockout practice. The overriding rule is simple: the padlock is removed by the person who applied it.

Step 4. Release stored energy

Disconnection does not remove energy that remains in the system. You need to discharge capacitors, release pressure, support or lower raised parts and wait for cooling. In installations with hazardous media, draining and purging are added, which have their own requirements and usually their own permit.

Step 5. Verify zero energy

This step is often skipped as obvious, yet its absence accounts for many accidents. A start-up attempt with the switch locked out, a voltage-absence measurement with a tested meter, a pressure gauge reading: each of these confirms that the isolation works. In an electrical installation, verifying the absence of voltage comes before earthing and short-circuiting. The result is recorded by the person who carried out the check.

Step 6. Hand over to the work team and pass on the state

Only after the last safeguard is confirmed may the team be admitted. The person issuing the permit tells the contractors which sources are isolated, where the padlocks are and what must not be touched. When working with an external company, this step decides whether the contractor knows the energy is isolated or only assumes it.

Example duration of isolation steps, min

Example duration of isolation steps, minHorizontal bar chart: example duration of six isolation steps, from 5 to 15 minutes.051015minIdentify sourcesIdentify sources: 15 min15DisconnectDisconnect: 10 min10SecureSecure: 10 min10Release stored energyRelease stored energy: 10 min10Verify zero energyVerify zero energy: 5 min5Admit the teamAdmit the team: 5 min5
Source: Illustrative calculation: assumed durations for a single piece of equipment, without large-capacity stored energy

Typical mistakes in energy isolation

Three patterns repeat on the organisation's side. The first is diffused responsibility: one person isolates, another issues the permit, a third works, and only the holder of the paper sheet knows the state of the safeguards. The second is parallel work on a shared circuit, where the person withdrawing a safeguard does not know whether anyone else is still working. The third is a change during the job: an extra disconnection or a rearrangement that never makes it back into the document.

  • ignoring stored energy after the supply is disconnected,
  • no verification of zero energy before admitting the team,
  • a padlock removed by someone other than the person who applied it,
  • a safeguard withdrawn while another crew is still working,
  • a change to the isolation scope with no entry in the document.

Audit evidence: what to record

After an incident or during an inspection, what matters is not that a procedure exists but that its execution can be demonstrated. For every isolation, the record should answer: who, what, in what order, at what time and on what basis. This applies to every item of the sheet, from disconnection to verifying zero energy, and to the withdrawal in reverse order.

InnerWeb records who changed a permit, training results or an automation rule, and when. The audit trail helps in a dispute over a permit, in an inspection and in clarifying an accident. The list of audited objects is open and covers people's actions. The system supplies audit evidence, but it does not replace the decisions of responsible people and does not guarantee compliance with regulations.

How to map isolation in an electronic permit

A work permit in InnerWeb is an electronic document that moves through the preparation, main work and closure phases. Items of the isolation sheet, for example switching and safeguarding sheets, are mapped as preparatory tasks with an order, a responsible person and a required signature. A task with a signature can be closed only by an authorised person, and as long as the last safeguard is not confirmed, admission to work stays blocked.

Suspending the work does not remove the safeguards. An additional disconnection during the job is a new task that conditions resumption. Closure requires confirmation that the zone has been cleared and that the safeguards have been withdrawn in reverse order. We change the medium, not the procedure: steps, roles and form templates are set up in a workshop based on the plant's current documents.

Video

Frequently asked questions

Is switching off the machine enough to start work?

No. Switching off with a button neither cuts off energy sources nor protects against someone else re-energising the equipment. You need disconnection, securing with a padlock and tag, and verification of zero energy.

Who removes the padlock after the work is finished?

As a rule, the person who applied it. Exceptions, such as absence, should be described in the plant procedure, with an authorised person involved and a record made.

Does Polish law have a separate regulation on LOTO?

The obligation to protect against unintended start-up follows from general regulations and from risk assessment. The plant sets out the details in its procedures, so it is worth basing them on risk assessment and the current state of the regulations.

What does an electronic record offer compared with paper?

A who, what and when trail without re-typing, and a block on admission until the safeguards are confirmed. The record supports audit evidence but does not replace the procedure or the responsible people.