InnerWeb
Skip to main content

Linking an account to the portal step by step within a 180-second window

A contractor stands at the gate, a queue forms behind, and in front of them is a terminal screen asking to connect two accounts. The whole process fits within 180 seconds, but each of its steps has a protective purpose and is worth understanding. This guide walks through the link from the first sign-in to the confirmation and describes what to do when something does not match.

180 s
validity of a pending link
Source: internal card
3
safeguards: address, time, CSRF
Source: internal card

What is the link for, and when is it needed?

The link joins two accounts of the same person: the account at the plant, which holds their pass and trainings, and the account in the portal, where they have a professional profile. After linking, the employee logs in to the plant with the portal account instead of a separate password. This is a one-time action at the first sign-in, not a routine at every visit.

The link is needed only when the employee already has an account at the plant. A new person, whose account is created from an access request, follows a different path. If the e-mail address from the request exists at the plant, the account is not linked automatically, so this guide describes the step that completes the matter.

For gate security the practical instruction is this: a contractor with an existing plant account should have the password for that account with them, not only the portal login details. It is worth including this information in the invitation, so that the first sign-in does not end at the gate with a search for a forgotten password on a phone.

Step 1: sign in with the portal account and go to the password login

The first sign-in with a portal account does not open the plant. The employee is redirected to the regular password login. This is deliberate: the password is proof that the plant account belongs to this person, and not to someone who knows their e-mail address.

If two-factor authentication is enabled at the plant, the employee passes it at this stage exactly like any other user.

Step 2: check the address and the account that will be attached

The system compares the address from the portal with the address of the account confirmed by password. If they do not match, the link fails. The fix is simple: correct the address in the portal, or ask the operator to correct the address in the plant account, and then repeat the process.

Next, a screen appears showing which portal account is being attached. It is worth looking at it carefully: this is the last moment to stop the process if someone is trying to link an account that belongs to someone else.

Why doesn't the system match accounts by e-mail?

An e-mail address may be shared by several people or entered with a mistake. The account is bound to the person's identifier from the portal, which is stable and unambiguous. Logging in with a portal account also does not create new accounts at the plant, so no duplicate will arise.

Step 3: confirm within 180 seconds

A pending link expires after 180 seconds. If the employee was talking to security during that time and did not manage to confirm, the process starts again from the beginning, with no side effects on the account. The save requires confirmation with a CSRF token, which prevents the link from being triggered from an external page, for example through a crafted link.

On a shared gate terminal, the 180-second window is also a safeguard against leaving a session open: the next person cannot confirm someone else's link, because they will not manage to do it before it expires.

If one terminal at the gate serves several companies at once, agree with security that the employee does not leave the screen before confirming. The expiry after 180 seconds protects the plant, but it does not replace discipline at a shared device.

What to do if the link has failed?

The most common causes are a mismatch of addresses, exceeding the 180 seconds and an account that is locked or expired. In the first two cases the employee repeats the process. In the third case the matter belongs to the operator, because locked, disabled, deleted and expired accounts are rejected in the same way as with a password.

After a successful link, subsequent visits are ordinary logins with the portal account, with the same two-factor authentication as always.

Video

Frequently asked questions

Does the contractor have to link the account at every visit?

No. Linking is one-time. Later the employee logs in with the portal account.

What if 180 seconds pass?

The pending link expires and the employee starts the process again. The plant account does not change.

Does linking admit someone to the site?

No. Admission remains the plant's decision, and linking only connects two accounts of the same person.

Let's test the account link on your terminal

In the demo we will go through the whole process, from the first sign-in to an expired window, so that your security team knows what to tell contractors at the gate.

Let's talk