InnerWeb
Skip to main content

Induction training on a QR code tablet: how to launch the station

The training station at the entrance works only when reception and security understand that a scan of the badge code does not log anyone in by itself. The tablet shows whose code it is and waits for confirmation by a person. Below we describe this flow step by step and the places where questions usually arise.

3
surname characters required to search for an account
Source: karta
13
maximum number of search results
Source: karta

The same code for the gate and the tablet

A worker logs in on the training tablet with the same QR code that security scans at the gate. There is no separate password or second badge, which simplifies the organization of the station: one identifier is enough, and the worker carries it anyway.

However, a scan of the code on the tablet does not log in by itself. The tablet shows whose code it is and waits for confirmation by a person. This pause is deliberate: it protects against a situation in which a worker scans someone else's badge and the training is credited to the wrong person.

Why a scan is not enough

A scan confirms that the code was read, not that the person standing at the tablet owns the code. Confirmation by a person, most often a receptionist or a guard, adds the missing link: someone sees the face, the surname on the screen and can compare them.

For an audit this matters, because the result of the training is the basis for admission to the site. A training pass credited to the wrong account would mean that a person without training has a valid document in the system.

  • the tablet shows the surname of the code owner
  • a person compares it with the individual at the station
  • only the confirmation starts the training

Account search limits at the station

Account search limits at the stationBar chart: minimum 3 surname characters and maximum 13 search results.051015pcs.Minimum surname characters: 3 pcs.3 pcs.Minimum surname charactersMaximum results: 13 pcs.13 pcs.Maximum results
Source: InnerWeb feature documentation

Training language

The language chosen at registration determines the language of the training. When a version in that language is missing, the system requires the training in Polish instead of skipping it. For reception this means two things: ask about the language at registration, and before launching the station check which versions are available.

If crews from several countries work at the plant, the list of languages should follow the actual data on external companies, not guesses. Only on that basis is it worth preparing versions of the training.

When the worker's account has to be found

Searching for an account with an RFID card at the training station requires at least 3 characters of the surname, returns up to 13 results and does not reveal the card number. A worker without a badge can therefore be found by the receptionist, but the card number does not leak onto the station screen.

The limit of 13 results forces the query to be narrowed when the surname is common. This solution is safer than an unlimited list, because it limits browsing of accounts by unauthorized people.

How to organize reception work

With a larger group the receptionist takes the codes one by one, confirms each of them and directs people to free tablets. For groups of more than a dozen people it is worth planning a second station or spreading arrivals over time.

Launching the station: task list

Before launch prepare the tablet with access to the training, a work mode without the possibility of leaving the application, and a short instruction for reception. Test three scenarios: a regular scan and confirmation, a person without a badge, and a person whose training does not exist in the chosen language.

After the first week review the records: how many people complete the training without interruption, how many come back for a correction and how many report a login problem. These numbers will show whether the station needs a second tablet or a change of instruction.

Checklist

Video

Frequently asked questions

Will a scan on the tablet log the worker in automatically?

No. The tablet shows whose code it is and waits for confirmation by a person.

Will the tablet show the RFID card number?

No. Account search requires 3 surname characters, returns up to 13 results and does not reveal the card number.

What if the training does not exist in the worker's language?

The system requires the training in Polish instead of skipping it.

Let us launch the training station at the entrance

We will show the tablet flow and the confirmation by reception on your example. Let us arrange a short meeting with security.

Let's talk