Contractor work history: how to read it and what not to look for in it

A coordinator who receives a contractor's work history wants to answer two questions: has this person already worked with a similar risk, and is there a sign of fatigue from excess hours? The first comes from the history, the second requires knowing where the hours limit rule sits. This guide shows how to read permit records, what is deliberately missing from them and how to avoid wrong conclusions.

0.8%
of time records longer than a week
Source: internal card: measurement on a live installation
4
work statuses counted toward exposure
Source: internal card

What is the work history built from, and what is its source?

The work history is not a declaration by the contractor. It is a record built from real permits for hazardous work and from time records at the plant. The contractor has one professional profile in the portal: permissions, trainings, medical examinations and the work record. Part of the work record feeds in from the plant, which shares the person's history with the portal in read-only mode.

For the coordinator this means evidential value: an entry in the history is a trace of a real event at the plant, not an item from a CV. At the same time it is a trace from the perspective of one specific plant, so the history of one installation does not describe a worker's whole career.

Which jobs count toward risk exposure?

Only hazardous work that was actually carried out counts toward risk exposure, meaning work that was approved, opened, monitored and closed. Submitted but unapproved permits and rejected permits do not enter the summary. When someone has many submissions but few approved ones, the history will not show them as a person with high exposure.

This distinction protects against two errors. The first is overstating experience based on submissions alone. The second is understating caution toward a person who actually worked at risk but was not recorded in their own company's register.

How do you turn this into a task allocation decision?

Treat exposure as a hint when allocating work, not as a qualification. For work at height in a hazard zone, choose a person whose history contains closed jobs of a similar type, and at the same time check the validity of trainings and examinations in the separate field of the profile.

Permit statuses: what counts toward risk exposure

Permit statuses: what counts toward risk exposureHorizontal bar chart: four statuses counted toward exposure, two statuses skipped01234statusesCounted: approved, opened,monitored, closedCounted: approved, opened, monitored, closed: 4 statuses4Not counted: submitted,rejectedNot counted: submitted, rejected: 2 statuses2
Source: Summary from the feature description, internal card

Why doesn't the plant sum working hours?

The plant does not sum working hours in the history it passes to the portal. On a live installation 0.8% of time records lasted longer than a week, and almost all of these entries were closed automatically. Such an entry does not mean that someone worked 168 hours without a break; it means that it was not closed manually at the exit. A sum of hours calculated from such data would be fiction.

The hours limit rule sits with the portal, which sees a person's work across many clients and can assess it as a whole. The plant coordinator should therefore not draw conclusions from the history about exceeding working time norms. Portal data and the employer's documentation serve that purpose.

How do you search for a person, and why must the number have a country code?

A person's history is searched by a phone number stored in international format with the country code. The number is compared in full, and a number without the plus sign is rejected, not assumed to be Polish. Where many foreign workers are among the contractors, this reduces the risk of assigning the history to the wrong person with a similar number.

The channel is protected by a machine token in the header, and the token is never accepted in the URL so that it does not end up in logs. The coordinator does not handle this directly: the portal performs the read, and the coordinator sees the result within their admission process.

How do you avoid common interpretation errors?

The most common error is inferring from a missing entry: no history does not mean no experience, only no work at this plant. The second error is equating the number of entries with the level of risk. The third is treating the history as consent to enter: admission to the site remains the plant's decision.

Good practice is to write into the procedure what the history is for: selecting tasks and talking with the contractor's supervisor, not automatic HR decisions.

Video

Frequently asked questions

Does a missing entry in the history mean no experience?

No. It means no recorded work at this plant. Experience can be confirmed by trainings, examinations and a conversation with the contractor's supervisor.

Why can't we see a sum of hours?

Because entries closed automatically would inflate the sum. The hours limit rule is applied by the portal, which sees the work across many clients.

Does a rejected permit enter the history?

No. Only work that was actually carried out counts toward risk exposure.