InnerWeb
Skip to main content

How to issue an employee card step by step

Issuing a card to an employee takes six steps: verifying the person, personalization, linking the card to the person in the register, handover, the first scan and induction training. Each step has one person responsible and leaves a trace in the register, so that an audit can show who issued the card, when and why. This guide describes the procedure for HR and security in a plant with encrypted cards.

6
steps in the card issue procedure
Source: procedure described on this page
13
maximum number of results of the account search for a card
Source: InnerWeb feature sheet

Before you issue a card: check the person's account

The first step concerns the person, not the card. Before personalization, check whether the person already has an active account in the system, because two active accounts are the beginning of training problems at the gate. When a person has two active accounts, the training result may land on the account without a card, while the account with the card still reports missing training.

The check takes a minute and consists of searching for the person in the register. If the account exists, the new card is linked to it. Merging accounts is done by a person after reviewing the changes, never by an automatic match on surname alone.

Card personalization

Personalization covers writing the application and keys, assigning a number, printing the card and linking it to the person in the register. This is the stage at which the master key and diversification are used: the card key is derived from the master key and the card's unique UID, so a leaked key does not open the other cards.

Personalization is carried out by a designated person in security or HR, and only at a workstation that has access to a SAM module or another protected solution. The master key should not be stored in a file or in an import script. A card that has been printed and written but is not linked to a person does not enter circulation.

What to print on the card

The first name, the last name, the company and a photo are the standard. The system's card number is not printed legibly, because that would make it easier for an outsider to find the card in the register. A QR code on the badge is convenient: it serves for the gate, for invitations and for logging in to training.

Parameters of the card account search in training

Parameters of the card account search in trainingBar chart: minimum 3 characters and maximum 13 results of the account search051015valueMinimum characters: 3 value3 valueMinimum charactersMaximum results: 13 value13 valueMaximum results
Source: InnerWeb feature sheet: card account search in training

Handover and the first scan

The card is handed over in person, with a signature or a confirmation in the system. The register records the card number, the person, the issue date, the status active, the reason (new employee) and the person who carried out the operation. These fields are the minimum that allows the history of the card to be reconstructed during an audit.

The first scan takes place at the gate in the presence of security. The scan event goes to the access control system, and from there to InnerWeb through a webhook authenticated with a token that is valid for a limited time, 12 hours. The event includes, among other things, the time, the place, the first name, the last name, the company and the number of the active card. The first scan therefore confirms that the card works and is linked to the right person.

QR code on the badge and induction training

The QR code on the badge serves for the gate, for invitations and for logging in to training, but a scan does not log in by itself: the person's confirmation is required. This protects against the situation in which someone else's code opens someone else's training.

In the variant of training with an account linked to an RFID card, the employee scans the card and selects their own account, or selects the company remotely and types part of a first or last name. The search requires at least 3 characters after text normalization, returns at most 13 results, and shows only active accounts with an active card assignment. It does not reveal the card number or the full list of employees. After a result is selected, the training is assigned to the existing account with the card, not to a new account. This variant is switched on with a configuration flag, so it is an option that the installation chooses.

What stays in the register after issue

After a card is issued, the register should contain the number, the person, the issue date, the status, the reason and the operator. Only a complete set of fields allows an audit to answer who received a card, when, and who was responsible for it.

Add three periodic checks: once a quarter, confirm that no active cards belong to people who have left; compare the number of issued cards with the number of employees; and review replacement cards. The details of the checks are in the separate checklist.

Checklist

Video

Frequently asked questions

Who carries out card personalization?

A designated person in security or HR, at a workstation with protected access to the keys. The role of key administrator is separate from the role of system administrator.

Can a card be issued before training?

Yes, with access to general zones. Zones that require training open once it is passed.

Does a scan of the QR code log in to training immediately?

No. The scan does not log in by itself, and the person's confirmation is required.

Does InnerWeb personalize cards?

No. InnerWeb is a software manufacturer. Cards are personalized in the plant's access control system, and we receive scan events and link them with qualifications.

Sources

Let's put card issuing in order

We will show how the access control scan event connects with training and the permissions of a new employee.

Let's talk