InnerWeb
Skip to main content

Rolling out alerts step by step: e-mail, SMS and phone in one hall

Alerts are best launched in one hall, with one group of external companies, before they cover the whole plant. This guide walks through seven steps, from the connectivity test of each channel to the first grouped alarm. Each step ends with proof that stays in the logs.

7
steps to launch alerts in a pilot
Source: poradnik
55 min
aggregation window of the grouped alarm
Source: karta

Step 1: define the scope of the pilot

Choose one hall and a few external companies with different contact data: one with an e-mail address, one with a phone number only. This selection tests all invitation paths at once, not only the easiest one.

Record who the coordinator is on the side of each company. Without this person the no-training alarm has no addressee.

Step 2: check the e-mail channel

The system sends e-mails through a queue, and the delivery status has three states: queued, sent and error after the retry attempts are used up. Send a test message to an external account and to a phone, then check in the list that the status changed to sent.

All messages carry the plant name as the sender, in the subject and in the header, and InnerWeb only in the footer. Check that the message did not land in spam; if it did, IT adds the sending domain to the trusted list.

How many channels each stage of the pilot covers

How many channels each stage of the pilot coversChart: the connectivity test covers 4 channels, the campaign and the grouped alarm 3 each.01234channelsConnectivity testConnectivity test: 4 channels4Training campaignTraining campaign: 3 channels3Grouped alarmGrouped alarm: 3 channels3
Source: InnerWeb notifications function documentation: e-mail, SMS, phone, team messenger

Step 3: check the SMS

Send an invitation to a test account with only a phone number. The text is transliterated into the GSM 03.38 alphabet, so it should take one segment (160 characters). A longer message leaves a warning in the log.

Click the link from a phone connected to a mobile network. The short link must open without a session, because the recipient does not have one yet.

Step 4: check the phone call

Calls go out from the PBX exchange. The dialer calls one at a time, and a single call with a speech synthesiser lasts roughly 25-33 seconds. Call a test number and assess how clear the message is in the hall, not in a quiet office.

Remember that the callback covers only external companies, accounts with a phone number and active trainings, and that the first call goes out one day after the invitation.

Step 5: connect the team channel

The team channel in the messenger shows reception events and is switched on with one setting containing the webhook address. Configure it for the pilot hall and send a test event.

If the network blocks outgoing traffic from the application host, this requires a separate path described in the notes on networks without outgoing traffic.

Step 6: set preferences and start the first campaign

Each user chooses separately which e-mail notifications they receive; no value means enabled. Safety-critical notifications cannot be switched off. Tell the pilot participants that muting applies only to configurable notifications.

Then send training invitations to the pilot companies and wait the first day. Check whether the reminder call reached the people who have not completed the training.

Step 7: trigger the first grouped alarm

At the gate, scan several codes of people without valid training from one company. The aggregation window is 55 minutes, so the coordinator should receive one message by phone, e-mail and through the messenger, not one per scan.

Record the result: number of scans, number of notifications, time of arrival. This is the proof of the pilot's effectiveness and the basis for the decision to extend to other halls.

  • one hall, several companies with different contact data
  • e-mail test with status sent
  • SMS in one segment with a link opened from a mobile network
  • phone call checked in the hall
  • team channel with a test message
  • first grouped alarm with proof in the log

Video

Frequently asked questions

How long does the alert pilot last?

It depends on the campaign. The first reminder call goes out one day after the invitation, so a full run takes at least several days.

Who should take part in the test?

IT for mail and firewall, the coordinator of the external company and gate security. Each person checks the channel that concerns them.

Is an e-mail test enough?

No. SMS, phone and the team channel have separate technical paths, and each one must be checked separately.

What if the team channel does not receive messages?

Check the webhook address and whether the network blocks outgoing traffic from the application host.

Are you planning an alert pilot in one hall?

Book a meeting with InnerWeb. We will lay out a seven-step plan for your hall and external companies.

Let's talk