InnerWeb
Skip to main content

Agency presence on site: guide after an alarm

After an evacuation alarm the assembly point manager must know within a few minutes how many people from each agency were in the hall and who is missing at the assembly point. The guide describes how to rebuild this from the evacuation list based on gate scans, and what to do when the list and reality differ.

13 s
refresh of the evacuation list
Source: evacuation list function sheet
4
instruction languages in the training kiosk
Source: training kiosk function sheet

How the list knows who is on site

The evacuation list is built from QR scans at the gate. Each entry and exit records a gate entry, and the list refreshes every 13 seconds. It divides people into groups, including external companies with tabs per company, so the assembly point manager sees at once the number of people from each agency.

Recording an entry or exit of a guest from the panel also records a gate entry. As a result the person appears on the evacuation list and in the On site view even when security entered them by hand because the scanner did not work.

Procedure step by step

It is worth rehearsing the procedure during a training alarm, not a real one. The steps below assume that the list is available on the phone or tablet of the assembly point manager.

Step 1: open the evacuation list

After the alarm is announced, open the evacuation list with its latest refresh. The refresh every 13 seconds means that those who left through the gate during the evacuation disappear from the list within at most a dozen or so seconds, while those who did not scan remain.

Step 2: go to the company tabs

The tab of each agency shows its people on site. The agency coordinator at the assembly point reads the names aloud, and the manager ticks off those present. The names left over are the people nobody saw at the assembly point.

Step 3: separate absence from a recording error

A missing person may be in the hall or may have a recording error, for example a missing exit scan from an earlier shift. Check the time of the last entry: if it is many hours old and the shift has ended, it is probably a missing exit, but the decision to search is made by the rescuer, not by the system.

Sample split of people on site by agency during an alarm

Sample split of people on site by agency during an alarmPie chart of a sample split of 200 people: 42, 31 and 18 from agencies and 109 plant employeesAgency A: 42 people (21%)Agency B: 31 people (15.5%)Agency C: 18 people (9%)Plant employees: 109 people (54.5%)200peopleAgency A42 people (21%)Agency B31 people (15.5%)Agency C18 people (9%)Plant employees109 people (54.5%)
Source: Illustrative example: numbers set for the chart, not plant data

Recommendations for agencies

The agency has the greatest influence on the quality of the list, because it provides the data of the people. The spelling of the company name must be identical in every shift, otherwise one agency splits into two tabs and the number of people at the assembly point stops matching.

The agency coordinator should know the assembly point of their group, and foreign workers should receive the instructions in their language. The kiosk training system supports Polish, English, Ukrainian and Russian, so the evacuation instruction can be part of the induction training.

After the alarm: report for the plant and the agency

After the alarm ends, keep a copy of the list with the time. It shows how many people from each agency were on site and when they left. The report is useful when assessing the exercise, in talks with the agency about scanning discipline and during an audit.

The same list does not replace the plant's evacuation procedure or the decisions of the persons responsible for the evacuation. It is an information tool that shortens the time needed to establish whom to look for.

What to do at a plant with existing access control

If the plant has its own access control system, card registrations can be sent to InnerWeb by webhook. According to the specification the access control system sends them in real time, with the time from the reader, the direction, entry or exit, and the event identifier. Presence after an alarm is based primarily on the QR gate scans, and card registrations are a supplement. The scope of the integration and the rules for pairing entries with exits are agreed with the access control supplier before implementation.

Video

Frequently asked questions

How quickly does the list react to an exit through the gate?

It refreshes every 13 seconds, so the change is visible within a dozen or so seconds of the scan.

What about a person entered by hand by security?

A gate entry recorded from the panel creates a gate record, so the person appears on the evacuation list and in the On site view.

Does the list replace the evacuation procedure?

No. It is an information tool that helps establish whom to look for; decisions are made by the persons responsible for the evacuation.

Let us rehearse the alarm on the evacuation list

We will show the list per company on sample data. Book a demo of InnerWeb.

Let's talk