When the message with the code actually goes out
The message with the QR access code goes out only when the gate would let the person in from the training point of view. As long as a required training is missing, the code is not sent, because the person would be turned away at the gate with a red verdict anyway.
Other entry conditions do not block sending. A permit, a visit for today or a health declaration may still be pending. The reason is practical: the code is needed to reach the gate and sign the declaration, so holding it until the signature would create a vicious circle.
Can the code arrive twice
The message is sent once. The guarantee comes from an atomic change of a flag in the database, not from a queue that could repeat a job. Three independent events can trigger sending: issuing a new badge, passing a training and a queued job. Whichever runs first, the person gets exactly one message.
For the inviting person this means there is no manual check: there is no need to ask the guest whether the email arrived twice, or to ask the administrator to delete a duplicate.
Email or SMS: the order of channels
Email has priority. When a person has no email address but a phone number is stored in the system, the code is sent by SMS. There is no parallel sending through both channels, so the guest does not receive the same code twice in different forms.
In practice it is enough for the inviting person to enter one of the contact details when registering the guest. It is still worth checking which channel is actually filled in, because it determines the form in which the code arrives.
A guest with neither email nor phone
A person with neither an email address nor a phone number receives nothing. The system does not guess a contact and does not send the code to a random address. In that case the badge is printed by security at the gate, and the guest receives it in physical form.
For the inviting person this is a clear organisational rule: if the guest gave no contact at all, tell the security desk in advance that a label with a QR code must be printed when the guest arrives.
- Email on file: message with the code
- No email, phone on file: SMS with the code
- No email and no phone: badge printed by security
Internal employees and people without a password
Internal employees are excluded from sending the code. They enter the site with their own means, and the system does not flood them with messages meant for guests and contractors.
A person with an invitation who has not yet set a password can still enter. The password is used to log in to the system, not to control entry to the site. Training and permits are checked exactly as for everyone else, so a missing password does not bypass any requirement. It is simply not an extra obstacle at the gate.
What the inviting person should know before sending an invitation
The inviting person is responsible for making sure the guest holds the training required for a given zone and that at least one contact channel exists in the system. Other elements, such as the health declaration, can be completed at the gate.
If a guest reports that they did not receive the message, first check the status of their trainings, because this is the most common reason for held sending. Only after that check the spam folder or the correctness of the phone number.
Video
Frequently asked questions
Will a guest without training get the code?
No. The message is sent only when the gate would let the person in from the training point of view. After passing the training, the code is sent automatically.
Does a missing health declaration hold the code?
No. A permit, a visit and a health declaration do not block sending, because the code is needed to enter and sign.
What if a guest has neither email nor phone?
The system sends nothing, and security prints the badge at the gate.
Does a company employee get such a code?
No. Internal employees are excluded from sending.
Organise code delivery to your guests
In a demonstration we will show when and on which channel the code is sent, and how security prints a badge for a person with no contact.
Let's talk