InnerWeb
Skip to main content

Grouped training gap alerts: how the 55 minute window works

The head of security usually asks one question: why does a contractor's coordinator get one call instead of ten, when ten people were stopped at the gate. The answer is aggregation in a rolling 55 minute window, which turns a flood of calls into one clear message per company.

55 min
notification aggregation window per company
Source: karta
5
surnames read out in the grouped call
Source: karta
8 min
buffer check cycle
Source: karta

Where the notification comes from

When a worker without valid OHS training is scanned at the gate, the system creates an alarm permit. This permit is generated by the system and does not go through the preparation phases known from work permits. Its creation is the start of a countdown after which time-based tasks run, including the notification of the coordinator.

The notification goes to the coordinator of the real employer of the scanned person. It is not the control account on which the alarm permit is technically created. This way the information reaches the person who can send the worker to training or withdraw them from the plant.

Why one call per company and not per person

Training gap notifications are aggregated. In a rolling 55 minute window the system places one call, sends one e-mail and publishes one channel report per company, instead of calling separately about each person stopped.

The reason is practical. In the morning several crews usually appear at the gate at the same time. If the coordinator had to take a separate call for every person, after the third call they would stop taking them seriously. One call with a list of surnames is a signal that can be acted on.

How many surnames are heard on the call

The grouped call reads out up to 5 surnames. With more people the phrase "and others" is added. The full list is in the e-mail and in the channel report, so the call serves as an alarm, not as a document.

How often the system checks the buffers

The sending module checks the buffers every 8 minutes. In practice this means that from the stop of the first person to the call, the time is set by the aggregation window and the check cycle, not by a dozen separate calls within a minute.

Notification aggregation parameters

Notification aggregation parametersBar chart: 55 minute aggregation window, 8 minute buffer cycle, 5 surnames on the call.0204060min or pcs.Aggregation window (min): 55 min or pcs.55Aggregation window (min)Buffer cycle (min): 8 min or pcs.8Buffer cycle (min)Surnames on the call (pcs.): 5 min or pcs.5Surnames on the call (pcs.)
Source: InnerWeb feature documentation

What if the line is busy or the network is down

The sent marker of a time-based task is saved only after a successful call. A brief network failure therefore does not lose the notification for good: the task does not receive the sent marker and is picked up again in the next run.

For the head of security this means one practical rule: the lack of a call at a given moment is not proof that no notification was sent. The channel report and the e-mail are checked, because these channels run in parallel with the call.

How to set expectations in the pilot

In the pilot the most common mismatch is between the expectation that the call arrives immediately and the actual rule of the window. It is worth settling this with the coordinators of external companies before the start and describing it in a short instruction: who calls, what is said and where the full list can be checked.

The second element is the consistency of contact data. The call reaches only the place where the coordinator has a current number in the system. Before the pilot it is good to go through the list of external companies and verify who the coordinator is in each of them.

How to read a grouped notification

A grouped notification contains the company name, the number of people without valid training and the first surnames. At that moment the head of security has three options: wait for the coordinator's reaction, contact them directly, or apply the gate rules from the plant instruction.

For an audit the trace itself has value: the alarm permit, the time of its creation, the notifications sent and the channel report show that the plant reacted in line with the procedure.

Video

Frequently asked questions

Will the coordinator get a separate call for each person?

No. In the rolling 55 minute window there is one call, one e-mail and one channel report per company.

How many surnames will the automatic call read?

Up to 5 surnames. With more people it adds "and others", and the full list is in the e-mail and the report.

What if the call does not get through?

The sent marker is saved only after a successful call, so the task is picked up again in the next run.

Who is the addressee of the notification?

The coordinator of the real employer of the scanned person, not the control account on which the alarm permit is created.

Let us set up notifications for your contractor companies

We will show what the grouped call, the e-mail and the channel report look like for the coordinator. Let us arrange a short conversation before the pilot.

Let's talk