What decides whether a person is let in to the workshop?
The security panel works on the gate screen. A scan of a QR badge or an RFID card gives a verdict on whether the person may be on site. The verdict has four elements: valid training, qualification for hazardous work, an active permit (or a scheduled visit) and an active account.
At a railway workshop this means that a service company mechanic whose training for work in the inspection pit has expired will not pass, even with a valid badge. A person coming in to give a quote does not need a work permit if a visit is scheduled, but still needs the training and an active account.
Does security have to press a button to let someone in?
There is no such button. The scan itself is the act of control, and every scan, including a rejected one, is written to the gate log. For the shift manager this matters: you cannot let someone in outside the system and still have a clean log, because the log is made up of the scans alone.
Security therefore focuses on what appears on the screen and on the person in front of the gate. The decision to enter follows from the verdict, not from the duty officer's discretion.
Double-scan protection windows
How does the system know whether it is an entry or an exit?
The system sets the direction of the record. A green verdict and a person from outside the plant gives an entry, a green verdict and a person inside gives an exit, and a red verdict gives a recorded refusal. Nobody picks the direction by hand, so there are no mistakes of the type "exit recorded as entry".
This means one gate handles traffic in both directions, and the list of people on site stays consistent with the scans. It is the basis for the later evacuation list and attendance list.
What does security see after a refusal?
A refusal states what is missing: the name of the training, the name of the qualification or the permit. The refusal notification carries the person, date, place and the missing item, so the shift manager gets the full picture without calling security to ask what happened.
The voice alarm on refusal tells a missing training apart from a missing permit. In other cases only the refusal signal sounds. Security at the gate therefore hears at once whether the matter concerns training or a work permit, and knows whom to send the person to.
What happens when someone scans a badge twice in a row?
A repeated scan within a short interval is rejected on the server side (a 5 second window) and on the browser side (a 2584 ms window). This way quick repeated scans do not create contradictory records, for example an entry and an immediate exit by the same person.
On a shift when a crew enters densely, one person after another, someone may tap their badge twice out of nervousness. The protective window means the log keeps one record, not two.
Can the QR code be read from someone else's photo of a badge?
The QR badge token is 64 hexadecimal characters from a random generator and is not derived from the number or the date. The scanner is an unauthenticated device, so the content of the code is treated as untrusted: it has a length limit and reveals nothing to a person who photographs the badge.
Cancelling a badge issues a new one instead of overwriting the old one. After a badge is lost, the old code stops working and the new one goes to the owner. In a workshop, where badges lie in lockers and coverall pockets, this is a practical difference.
Does the gate work with RFID cards the same way as with QR?
The panel supports scanning a QR badge or an RFID card. InnerWeb does not make or replace access control readers: it integrates with the client's existing access control system. If the workshop already has its own readers at the gates, punch events reach InnerWeb from the access control system through a webhook.
In that case the access control system opens the physical barrier, and InnerWeb adds to each punch the knowledge about training, qualifications, permits and attendance.
How often does security change the gate settings?
In practice, never. The gate and scanner settings are made once before go-live and then only after a hardware change. A change of scanner interface restores the default symbology settings, so after every scanner replacement it is worth repeating a short test with a badge.
We describe the scanner configuration in a separate guide for IT. Security needs to know only that after a scanner replacement a test scan has to be made.
What should the shift manager check before the gate goes live?
Four things: whether the scanner reads a badge with an address, whether a test scan produces a record in the gate log, whether a refusal shows the missing item and not just a red screen, and whether the list of people on site matches the number of people in the hall. The test takes a few minutes and is best done at the start of the first shift after go-live.
Video
Frequently asked questions
Can the gate let someone in manually?
The panel has no entry button. The scan is the act of control, and every scan, including a rejected one, is written to the gate log.
Who sets the direction of the record?
The system. A green verdict and a person from outside is an entry, a green verdict and a person inside is an exit, and a red verdict is a recorded refusal.
Can security see what the person entering is missing?
Yes. A refusal names the missing training, qualification or permit, and the notification carries the person, date, place and the missing item.