Purpose of the demo and who watches it
The demo is for the management of an agricultural machinery plant that belongs to a global group, and it has one job: to show that work safety can be seen on a hall map, not only in a binder. The audience is the plant director, the OHS manager and a representative of the IT department.
This is a scenario that has yet to be run at the offer and demo stage. We therefore do not describe rollout results, only the order of the scenes and what each one should prove.
Demo scenes step by step
The scenario contains five scenes on one isometric hall map with transmitters placed on it. Each scene lasts a few minutes and ends with a question to the audience.
- Scene 1: isometric hall map with transmitters, showing zones and workstations
- Scene 2: risks assigned to a location, meaning what threatens in a given spot of the hall
- Scene 3: issuing a hazardous work permit from a ready template
- Scene 4: guest registration at a kiosk with a QR code included in the invitation
- Scene 5: SOS signal and worker stillness shown on the map, from the dispatcher's perspective
Why an isometric map
An isometric view shows the hall the way the workforce knows it: divided into production lines, the warehouse and communication zones. The director recognises the place at once, so the conversation concerns specific workstations rather than an abstract system.
Why permit templates
A permit from a template shows that the OHS manager does not fill in every document from scratch. Risks and preventive measures are suggested from prepared dictionaries, and the person issuing the permit approves them.
Sample duration of the demo scenes
SOS and stillness: the scene that stays in memory
The final scene usually decides how the whole demo is received. We show the SOS signal and stillness, meaning no movement by a worker for a set time, visible to the dispatcher on the hall map. The position comes from the signals of many transmitters and is averaged on the map, and the system works without GPS.
In a building, roughly one transmitter per 100-200 m² is assumed. During the demo, however, we do not give a device count for a specific plant, because it follows from the design made after a site survey.
What to prepare before the demo
Preparation requires three things from the plant: the hall plan to be mapped, a list of a few typical hazardous jobs to show on the templates, and a person to play the guest at the kiosk. The rest is on the vendor side.
It is also worth agreeing in advance with the IT department what the demo does not touch. InnerWeb is an independent system that complements the plant's existing systems, such as access control, time and attendance, HR and ERP, so the demo does not require changes to any of them.
How to assess the demo afterwards
After the demo, collect three answers from the audience: which scene was the most convincing, what was missing, and which workstations should go into the pilot first. These answers become the scope of the pilot conversation, not a general declaration of interest.
Questions that will follow the demo
The plant director will first ask about the effort on the plant's side: who prepares the map, who enters the permit templates and how long it takes. The answer depends on the number of halls and workstations in scope, so it is worth having a rough schedule ready for one hall.
The OHS manager will ask about documents: whether permits from templates meet the group's standard and whether they can be printed in the worker's language. The system generates documents in six languages and the printout has separate translation keys, so the answer is best backed by a trial printout in two languages.
The IT representative will ask about infrastructure and integrations. One sentence helps here: the system works independently of access control, time and attendance, HR and ERP, and any data exchange is a separate decision after the pilot.
Video
Frequently asked questions
Does the demo mean a rollout at the plant?
No. It is a scenario for the offer and demo stage, and a rollout requires a design based on a site survey.
Does the demo require changes to the plant's systems?
No. InnerWeb is an independent system that complements the existing systems, so the demo does not change them.
How many transmitters are needed for the demo?
It depends on the scope of the hall shown on the map. In a building, roughly one transmitter per 100-200 m² is assumed.
Plan the demo for management
We will build the demo scenario together on your hall plan. Start with a conversation about the scenes and the scope.
Let's talk