Cyber Resilience Act: a guide for industrial plants

Regulation (EU) 2024/2847, the Cyber Resilience Act (CRA), has been in force since 10 December 2024 and imposes duties on manufacturers, importers and distributors of products with digital elements. An industrial plant is usually on the buying side, yet it bears the consequences of weak controllers, gateways and software. This guide explains what the CRA regulates and what to change in procurement.

24 h
early warning about an actively exploited vulnerability
5 years
minimum product support period (as a rule)
EUR 15 million
maximum fine or 2.5% of turnover

What the Cyber Resilience Act is

The CRA is an EU regulation, so it applies directly in Poland without an implementing act. It introduces cybersecurity requirements for hardware and software with a data connection placed on the EU market. The requirements cover the whole product life cycle: design, production, post-sale support and vulnerability handling.

For an industrial plant the key point is the difference between the CRA and NIS2. The NIS2 Directive (in Poland the Act of 23 January 2026 amending the National Cybersecurity System Act, KSC) regulates the organisation that uses systems. The CRA regulates the product that organisation buys. The two complement each other: Article 21 of NIS2 requires supply chain security and secure acquisition of systems, and the CRA gives the buyer a basis for expecting this from suppliers.

Who is covered and what a product with digital elements is

The duties are addressed to manufacturers, importers and distributors of products with digital elements placed on the EU market. A product with digital elements is hardware or software together with remote data processing solutions, if it has a logical or physical connection to a device or network.

In industrial practice this includes PLCs with a network interface, IIoT gateways, operator panels, industrial routers, measuring devices with communication, readers and radio beacons, and standalone software such as SCADA packages installed at the customer. A plant as an end user is not addressed by manufacturer duties, unless it places a product on the market under its own brand or substantially modifies someone else's product.

What usually remains outside the scope

The regulation excludes products covered by separate, specific rules (for example some medical devices and vehicles) and software as a service that is not part of the remote data processing of a product. The scope for a given device should be assessed from the text of the regulation and the manufacturer's declaration, not from an assumption.

Maximum fines under CRA Article 64

Maximum fines under CRA Article 64Bar chart: fines up to 15, 10 and 5 million EUR depending on the type of breach.051015EUR millionEssential requirements and Art. 13–14: 15 EUR million15Essential requirements andArt. 13–14Other obligations: 10 EUR million10Other obligationsIncorrect information: 5 EUR million5Incorrect information
Source: Regulation (EU) 2024/2847, Article 64

Deadlines you need to know

The CRA timetable is spread over time, and the nearest threshold has already passed. Knowing the dates tells you what to ask suppliers about this year.

  • 10 December 2024: the regulation enters into force.
  • 11 June 2026: application of the provisions on notified bodies (Chapter IV, Articles 35–51).
  • 11 September 2026: manufacturers report actively exploited vulnerabilities and severe incidents (Article 14), also for products already on the market.
  • 11 December 2027: full application of the regulation, including conformity assessment and CE marking of new products.

Main manufacturer obligations

The manufacturer must design the product in line with the essential requirements of Annex I: secure default configuration, security updates, protection against unauthorised access, minimised attack surface and event logging. It must also run vulnerability management throughout the support period.

The regulation requires a software bill of materials (SBOM), a support period of at least 5 years unless the expected product lifetime is shorter, and a coordinated vulnerability disclosure policy. For important and critical products (classes I and II) conformity assessment involves a notified body. Importers and distributors verify that the product they place on the market meets the requirements.

Reporting: 24 hours, 72 hours, final report

Article 14 introduces three-stage reporting through the ENISA Single Reporting Platform to the competent CSIRT and ENISA. An early warning must be submitted within 24 hours of becoming aware of an actively exploited vulnerability or a severe incident, a notification within 72 hours, and a final report no later than 14 days after a fix is available for a vulnerability, or within one month of the notification for an incident.

Penalties under Article 64

The sanctions are high and linked to turnover. Breaching the essential cybersecurity requirements and the manufacturer duties in Articles 13 and 14 carries a fine of up to EUR 15 million or 2.5% of worldwide annual turnover. Other obligations carry up to EUR 10 million or 2%, and supplying incorrect, incomplete or misleading information to authorities up to EUR 5 million or 1%.

For a buying plant, manufacturer penalties are an indirect risk: a supplier that fails to comply may withdraw a product, end support or raise the price. This is worth reflecting in the supply chain risk assessment.

What changes for the plant as a buyer

The plant does not file Article 14 reports, but from 2027 it has real leverage in orders. It can require a CRA declaration of conformity, an SBOM, a declared support period, a description of the vulnerability reporting process and a contact for the manufacturer's security team. For an NIS2 essential or important entity such clauses are also evidence of due care in the supply chain.

It makes sense to link the CRA with the IEC 62443 series: part 4-1 describes the secure product development life cycle and part 4-2 the technical requirements for components. The standard is voluntary, but it provides a common language between buyer and supplier and supports meeting the requirement in an audit.

  • Inventory devices with digital elements in the OT network and record the manufacturer and software version.
  • Ask key suppliers about their CRA compliance plan and vulnerability reporting channel.
  • Add CRA, SBOM and support period requirements to purchase order templates.
  • Plan replacement or compensating controls for devices whose manufacturer provides no updates.

First steps in the plant

The cheapest move is to organise knowledge of the device fleet. Without a register you cannot check which suppliers fall under the CRA, nor assess what happens after 11 September 2026 with vulnerabilities reported by manufacturers. The second step is to amend contract templates and purchasing specifications, the third is to link the results to the NIS2 risk register.

InnerWeb is a producer of software and an industrial beacon, so it applies similar logic on the supplier side. For buyers this means a conversation about specifics: which components a product contains, how long it is supported and how to report vulnerabilities.

Video

Frequently asked questions

Does the CRA apply to a plant that buys controllers?

Manufacturer duties do not apply to the end user. The plant will feel the changes in procurement: it can require an SBOM, a support period and a vulnerability reporting process. The exception is when the plant places a product on the market under its own brand.

When does the CRA apply?

The regulation entered into force on 10 December 2024. Manufacturer reporting duties (Article 14) apply from 11 September 2026, and full application follows on 11 December 2027.

How does the CRA differ from NIS2?

NIS2 imposes duties on essential and important entities as organisations, while the CRA addresses manufacturers, importers and distributors of products. A plant under Article 21 of NIS2 looks after its supply chain, and the CRA improves the quality of what reaches it.

Does an IEC 62443 certificate replace CRA compliance?

No. The standard is voluntary and can serve as an evidence framework, but conformity assessment and CE marking result from the regulation itself. A certificate supports meeting the requirement and provides audit evidence.

Sources