What the time spent on entering a delivery consists of
Manual entry of a delivery is not one action but a chain of small steps: setting the carrier, the type of operation, the gate and dock or warehouse, entering the driver's details and vehicle registration numbers, and checking that everything matches the document. Each element adds a dozen or so seconds, and together they come to about 4 minutes in our illustrative assumption.
The type of operation determines the label: unloading or loading. The name of the service point should match the warehouse codes in the dictionary of unloading docks, and with manual entry a single wrong character means the delivery is assigned to the wrong dock.
The hidden cost is the driver's time. The truck stands at the gate, and unloading in a plant running just in time has a fixed window. Every minute at the gate eats into the margin that logistics needs for unexpected events.
What fetching data from the appointment code changes
After the driver's appointment code is scanned, the system fetches the planned delivery data from the appointment system and pre-fills the form: the gate, the dock or warehouse, and the carrier. Security does not retype it, only checks and approves. The query to the appointment system is sent once, in the canonical 5-character code, and codes with leading zeros entered differently are normalised to one form.
Every code read is recorded in telemetry: the code entered, the query code, the result, the transport status, response time, source and operator. A failure to write telemetry does not interrupt security's work. Telemetry also has a cost value: it shows how many times a code did not work and where we return to manual entry.
The system does not guess. A delivery completed in the appointment system is deliberately treated as missing data, because the external system can return the last completed transport for many unrecognised codes. Security then enters the data manually, so the calculation should leave a margin for that share of deliveries.
Security minutes per day for delivery entry (illustrative calculation)
Cost structure of the implementation
The cost of the solution has a few elements: integration with the client's appointment system, completing the dock and carrier dictionaries in the panel, and training for security. Dictionaries are not loaded by migrations, so filling them in is administrative work, not a programming project.
Indicative price ranges from 2025-2026 implementations; individual quotation. The biggest influence on price is how access to the appointment system is provided and the number of gates. From our perspective, a sensible step is a conversation after measuring your own entry time, because that lets you calculate the return on concrete numbers.
When calculating the return, include indirect costs too: the queue at the gate, overtime for security at peak times and assignment errors to docks that then have to be corrected.
How to calculate it for your plant
Measure the delivery entry time at three times of day, because security works differently in the morning and at night. Count the number of deliveries per day from gate data for the last 30 days, not from the logistics plan. Then take the verification time after pulling the data (in our calculation 1 minute) and subtract it.
Convert the result into security FTEs and into minutes saved in driver waiting time. The second indicator usually convinces the logistics director more than the first.
Illustrative calculation: security time per day
| Parameter | Value |
|---|---|
| Deliveries per day | 60 deliveries |
| Manual entry of one delivery | 4 min |
| Verification after pulling data | 1 min |
| Days in the month | 30 days |
Result: Manual: 60 x 4 = 240 min per day. After the driver code: 60 x 1 = 60 min per day. Saving 180 min per day, which is 90 hours a month.
Note: Illustrative calculation on assumed values. Replace the values with a measurement from your own gate; implementation pricing is individual.
Video
Frequently asked questions
Are these numbers data from a plant?
No. They are illustrative assumptions to be replaced with a measurement from the reader's own plant.
What if the code is not in the appointment system?
Security enters the delivery manually. The system does not guess a delivery from other records.
Do dock dictionaries have to be loaded by migration?
No. Dock and carrier dictionaries are completed through the panel for a specific plant.
Let's count the time at your gate
Book a call. We will put measurements from your deliveries into the calculation and show how much time security and the driver get back.