What makes up the cost of a transmitter network
An optional BLE transmitter network on subscription is a single monthly fee with no equipment purchase. Indicative ranges from 2025-2026 deployments put 100 units at 700 PLN net per month, which typically covers about 20,000 m². An individual quote depends on the number of units, the type of site and the environmental requirements, so the figures given here are for an initial budget, not for an offer.
The subscription simplifies the budget for one reason: there is no capital expenditure on transmitters and no separate line for replacing them. There is, however, a fee that grows linearly with the number of units, so it pays to count the units precisely rather than order a spare batch just in case.
InnerWeb is a manufacturer of industrial software and beacons. ATEX certification for zones 2 and 22 matters at wastewater plants, where some sites, for example near fermentation chambers, may require equipment rated for explosive atmospheres. Whether a given point is a zone is assessed by the site owner on the basis of the classification.
How to convert floor area into a number of transmitters
A worker's position is calculated from signals of several BLE transmitters, averaged on the map. The system works without GPS. Two rules are enough for the calculation: on plant roads a transmitter is placed about every 100 m, and inside a building there is one transmitter per 100-200 m² of floor area.
An important methodological rule: each site is calculated separately according to its own area, without averaging across sites. A wastewater plant usually has a process building, a blower building, a mechanical section, a sludge drying area and garages. An average density across the whole site hides the difference between a crowded building and an open yard.
Buildings
For a building, take a range: 1 transmitter per 100 m² in rooms with many partitions and pipework, and 1 per 200 m² in open halls. The range gives a lower and an upper number of units.
Plant roads
Divide the length of the roads by 100 m and round up. Open tanks and yards that nobody walks across are left out of the calculation, unless they are part of a patrol route.
Monthly subscription for the sample plant
Sample calculation: a medium-sized wastewater plant
Consider a plant with buildings of a total area of 6,000 m² and 1,200 m of plant roads along which workers move. This is a sample calculation, not a description of a specific site.
For the buildings, a density of 1 transmitter per 200 m² gives 30 units, and 1 per 100 m² gives 60 units. For the roads, 1,200 m divided by 100 m gives 12 units. Together the range is 42-72 units.
The indicative subscription is taken as linear, at 7 PLN net per unit per month, which is 700 PLN divided by 100 units. For the range this gives 294 PLN to 504 PLN net per month, or 3,528 PLN to 6,048 PLN per year. These are indicative ranges from 2025-2026 deployments; the quote is individual.
The practical conclusion: a network for a plant of this size falls within a few hundred zloty per month, but the upper limit is 71 percent higher than the lower one. It is therefore worth settling the density in buildings during the pilot, on a single site, rather than in a table.
Distributed sites: a calculation per site
A water and wastewater utility rarely has only one plant. There are also pumping stations, water treatment plants and valve chambers. Each is calculated separately: a small pumping station with a single building may need a handful of units, while a large treatment plant may need several dozen.
Summing the results per site gives a realistic budget for the whole network, and avoiding a shared average protects against two errors: underestimating large sites and overestimating small ones. With a dozen or more sites, the difference can be larger than the subscription value of a single wastewater plant.
At unmanned sites, location inside a building is not needed everywhere. If it is enough to confirm that a service technician was at the entry, a few points are sufficient, and the QR scan at the gate covers the rest.
Number of transmitters by component
- Lower limit
- Upper limit
What else belongs in the budget besides transmitters
Apart from the network subscription, the budget covers a software module licence, devices worn by workers (watches and active cards) and any integration with an existing access control system. InnerWeb does not sell access control readers and integrates with the system the client already has, so the calculation has no line for replacing readers.
The preparatory work on the client side covers the site plan, the list of rooms and the patrol route. The better the input data, the more accurate the unit count and the smaller the correction after installation.
Transmitter network for a medium-sized wastewater plant
| Parameter | Value |
|---|---|
| Building floor area | 6000 m² |
| Density in buildings | 1 per 100-200 m² per transmitter |
| Length of plant roads | 1200 m |
| Spacing on roads | 100 m |
| Linear subscription | 7 PLN net/unit/month |
Result: 42-72 units, which is 294-504 PLN net per month (3,528-6,048 PLN per year).
Note: Sample calculation based on the assumptions above. Indicative ranges from 2025-2026 deployments; the quote is individual.
Video
Frequently asked questions
Does the subscription include the purchase of transmitters?
The network on subscription works without the client buying the equipment. The scope and the commitment period are set out in an individual quote.
Is GPS needed for location?
No. The position is calculated from signals of several BLE transmitters averaged on the map, so the system works without GPS, including inside buildings and in chambers.
How do you choose between a density of 100 and 200 m²?
It depends on the partitions and pipework in the building. The best approach is to test it in a pilot on one site and only then scale to the rest.
Do you use an average for distributed sites?
No. The calculation is done separately for each site according to its own floor area, and the results are summed, without averaging across sites.
Calculate the transmitter network for your site
Send us the plan of your wastewater plant or pumping station, and we will prepare the area-to-units conversion and an individual subscription quote.
Let's talk