Visit Register for Audits: How Many Hours a Year the Quality Department Saves

The quality department of a food plant prepares a summary of guests and health statements for an audit. From binders this takes several hours a month, from an electronic register it takes one export. Below is an example calculation for controlling and management, with assumptions the plant replaces with its own.

-42 h
a year in the quality department (example)
Source: example calculation
1 export
instead of copying from binders
Source: card

What the Cost of a Binder Summary Consists Of

A paper register costs nothing when it is written, only when it is reconstructed. An auditor asks for a list of guests for a chosen period, and the quality department goes through the pages, copies names, matches statements to dates and checks that no signatures are missing. Each of these steps is the time of a qualified employee.

On top of the direct cost comes risk: manual copying produces errors, and an auditor who finds one gap widens the sample. In a food plant, where the BRC standard requires a daily health statement from a guest entering a clean production zone, the statements are the main subject of the check.

What the Electronic Register Changes

A statement is recorded once per person per day, together with the channel it was signed through (workstation, reception, security panel, training, portal) and the time of confirmation. Each entry carries a SHA-256 hash of the text shown to the person, so a later change of wording does not rewrite history, and the quality department can show which version of the text the guest saw.

The summary is produced by a single export for the chosen period, not by copying. The quality department spends time only on reviewing the result. The system does not certify the plant and does not assess compliance: it provides a register and audit evidence, and the assessment belongs to the certification body.

Hours a year to compile guest and statement records

Hours a year to compile guest and statement recordsForty-eight hours a year from binders and six hours a year from the electronic register.01020304050hoursBinders: 48 hours48 hoursBindersElectronic register: 6 hours6 hoursElectronic register
Source: Example calculation: 4 h and 0.5 h a month

Example Calculation on Assumptions

The values below are the author's assumptions, not data from any plant. We assume that a summary from binders takes 4 hours a month and from the electronic register 0.5 hours (export and review of the result). The monthly saving is 3.5 hours, and the annual saving is 42 hours.

At an example rate of PLN 90 per hour of specialist work, the annual cost of summaries from binders is 4 times 12 times 90, which is PLN 4,320. From the electronic register it is 0.5 times 12 times 90, which is PLN 540. The difference is PLN 3,780 a year. The plant substitutes its own rate, based on the cost of labour in the company.

  • Binders: 4 hours a month, 48 hours a year, PLN 4,320.
  • Electronic register: 0.5 hours a month, 6 hours a year, PLN 540.
  • Saving: 42 hours a year and PLN 3,780 at the example rate.

Additional Audits and Limits of the Calculation

A plant that has several audits a year (certification, customer and internal) prepares a summary more than once a month. With two additional summaries a year at 4 hours each from binders, the saving grows by 7 hours, because each of them takes 0.5 hours on the electronic register side.

The calculation does not include the cost of implementation or licences, because these depend on the number of gates and modules, and pricing is individual. It also does not include the value of avoiding inaccuracies, which cannot be reliably priced. The most honest way to use the calculation: enter your own time from the last audit and compare it with the hour needed for an export.

Annual cost of summaries at an example rate of PLN 90 per hour

Annual cost of summaries at an example rate of PLN 90 per hourFour thousand three hundred and twenty zloty from binders and five hundred and forty zloty from the register.010002000300040005000PLNBinders: 4320 PLN4320 PLNBindersElectronic register: 540 PLN540 PLNElectronic register
Source: Example calculation: the rate of PLN 90 per hour is an assumption
Example calculation

Example Calculation: Quality Department Hours

Assumptions
ParameterValue
Summary from binders4 h/month
Summary from the electronic register0.5 h/month
Hourly rate of the specialist90 PLN/h
Summaries per year12 times

Result: 42 hours and PLN 3,780 of saving a year.

Note: Example calculation on the author's assumptions. The plant replaces the time from binders and the rate with its own data.

Video

Frequently asked questions

Where should I get my own hours for the calculation?

Measure the time it took to prepare the summary at your next audit and use it instead of the four hours.

Does changing the wording of a statement change old entries?

No. Each statement stores a SHA-256 hash of the text shown to the person, so the history stays intact.

Does the system assess compliance with BRCGS?

No. It provides the register and audit evidence, and the assessment of compliance belongs to the certification body.

Sources

Calculate your quality department hours

We will enter your summary time and rate into the calculation. Book a call or a demo.