InnerWeb
Skip to main content

Manual training checks versus the verdict at the scan: what it costs in minutes

The purchasing department usually asks one thing: how much security and OHS work is absorbed by manually checking the validity of contractor trainings, and what disappears after the verdict at the scan is introduced. Below is a sample calculation with explicit assumptions that every plant can recalculate with its own numbers.

-86%
time of checks and records in the sample calculation
Source: sample calculation
396 h
yearly saving under the sample assumptions
Source: sample calculation

What the manual check costs

Manual checking of contractor trainings has two components that are rarely counted together. The first is the guard's work at the gate: checking the document, comparing the expiry date with the calendar and, if needed, calling the coordinator. The second is the work of the OHS department, which keeps the records, catches approaching deadlines and answers the questions of security.

There is also a cost that is harder to measure: the risk that someone with an expired training gets in, because during the morning peak the guard did not manage to check the date. We do not price this component in the calculation, but it is worth keeping in mind when assessing the result.

What the verdict at the scan delivers

After a scan of a QR badge or an RFID card, the security panel at the gate shows a verdict on whether the person may be on the site. It consists of valid trainings, qualifications for dangerous work, a permit in progress and an active account. The guard does not compare dates: they read the result.

The scan itself is a control act and records the entry, so the record for OHS is created as a side effect of the gate's work, not as a separate task. The validity period is a configuration parameter, for example one year from the date of completing the OHS training, with the option to set the requirement for all companies except the indicated ones.

Yearly working time: manual versus the verdict at the scan

Yearly working time: manual versus the verdict at the scanBefore and after chart: gate check 20,000 minutes manually and 2,500 with the verdict; OHS records 7,500 and 1,250 minutes.0500010,00015,00020,000minManual (Gate check): 20,000 min20,000 minVerdict at the scan (Gate check): 2500 min2500 minGate checkManual (OHS records): 7500 min7500 minVerdict at the scan (OHS records): 1250 min1250 minOHS records
  • Manual
  • Verdict at the scan
Source: Sample calculation based on the assumptions in the Sample calculation section

Sample calculation

The figures below are illustrative assumptions, not data of a specific plant. We assume 120 checks a day at the gate for people from external companies, 250 working days a year, 40 seconds of manual checking per person and 5 seconds to read the verdict. The OHS department spends 30 minutes a day on manual records, and with the verdict at the scan 5 minutes a day on reviewing exceptions.

Manual checking: 120 times 250 gives 30,000 checks a year, at 40 seconds each this is 1,200,000 seconds, or 20,000 minutes. OHS records: 250 times 30 minutes gives 7,500 minutes. Total 27,500 minutes a year. With the verdict: 30,000 times 5 seconds gives 150,000 seconds, or 2,500 minutes, plus 250 times 5 minutes, or 1,250 minutes. Total 3,750 minutes a year.

  • difference: 23,750 minutes a year, about 396 hours
  • at a loaded rate of 70 PLN per hour this is about 27,700 PLN a year as an example amount
  • the result depends on the number of checks and the time of one check, so it is worth entering your own data

What the calculation does not cover

We do not count the cost of implementation, integration with the access control system or training of guards. Indicative ranges from 2025-2026 implementations are priced individually and depend on the number of gates, the number of external companies and the state of the existing access control system. InnerWeb does not sell readers: it integrates with the client's system, so the hardware cost on the plant side usually does not grow.

We also do not count the gain from fewer mistakes. The training report shows people without valid training, and the status is counted at every moment of presence on the site, not only at the moment of entry. This limits the situation in which a training expires during a multi-day stay and nobody notices.

How to recalculate this for your plant

Four numbers are enough: the daily number of checks, the time of one manual check measured with a stopwatch at the gate, the OHS time spent on records and the number of working days. The measurement is best done over a week at different times, because the morning peak changes the time of one check.

The result is presented to management as a range rather than a single number, because the credibility of the calculation depends on it. A cautious variant also helps: we assume only half of the manual time and treat the rest as an additional benefit.

Example calculation

Yearly time of checking contractor trainings

Assumptions
ParameterValue
Checks per day120 people
Working days a year250 days
Manual check40 s per person
Reading the verdict5 s per person
Manual OHS records30 min a day
Review of exceptions with the verdict5 min a day

Result: 27,500 minutes a year manually, 3,750 minutes with the verdict at the scan; difference 23,750 minutes, about 396 hours.

Note: Sample calculation on illustrative assumptions, not data of a specific plant. Indicative ranges from 2025-2026 implementations; individual pricing.

Video

Frequently asked questions

Does the calculation include the implementation cost?

No. It shows only the working time of security and OHS. The implementation cost depends on the number of gates and external companies and is priced individually.

Where should I get my own numbers?

From a week of stopwatch measurement at the gate, from the number of entries of external companies and from the time OHS spends on records.

Is the validity of a training fixed?

No, it is a configuration parameter. In one of the configurations the OHS training result is valid for one year from the date of completion.

Are new readers needed?

No. InnerWeb integrates with the client's existing access control system and does not replace the readers.

Let us recalculate this with your numbers

We will enter the number of checks at your gates and the time that checking trainings takes today into the calculation. Let us arrange a conversation with purchasing and OHS.

Let's talk