Cost items of a digital visitor register
The bill for a digital visitor register with a health declaration consists of several items, which are worth separating, because each has a different owner in the plant. The first is implementation and configuration on the supplier's side: the scope depends on the number of gates, the signing channels and integrations. Pricing is individual, and indicative ranges from 2025 to 2026 implementations depend on that scope.
- Configuration: switching on the declaration option, entering the wording in Polish and English, setting up the channels.
- Hardware: the gate station, a label printer and, if the plant wants one, a visitor kiosk; this is a purchase and integration, because InnerWeb is a software producer, not a device manufacturer.
- Training: a short instruction for reception, security and the secretariat.
- Notifications: an optional team channel in a messaging tool through a setting with a webhook address.
- Maintenance: updating the declaration wording after a change of requirements and reviewing settings before the audit.
The plant's own time before the audit
The second part of the bill is the time of the plant's staff. BRCGS Packaging Materials Issue 7 was published in October 2024 and applies in audits from 28 April 2025, so plants audited after that date are preparing their visitor procedures under the new edition. The standard requires control of personnel health: for materials in direct contact with food a documented procedure, and for others one implemented on a risk basis.
With a paper process, time before the audit goes on finding forms, checking completeness and preparing the sample. With a digital register the sample means choosing days and compiling entries, because each entry for one person per day carries the signing channel, the confirmation time and the SHA-256 hash of the text.
Who loses the most time
Usually the quality manager and the secretariat. The first is responsible for agreeing the form version and checking completeness, the second for finding missing signatures and labels for visitors ordered by phone or e-mail. These are the roles that gain the most from a digital register.
Hours of visitor sample preparation for the audit (sample calculation)
Sample calculation of audit preparation
The calculation is a sample and rests on the assumptions in the table. We assume one audit a year. With the paper process, preparing a sample of visits from three days takes the quality manager 8 hours, the secretariat 6 hours and the archive 2 hours, 16 hours in total. With the digital register the quality manager needs 2 hours to choose the days and compile entries, and the secretariat 1 hour, 3 hours in total.
At an assumed cost of 60 PLN per hour the paper process costs 960 PLN per audit, and the digital one 180 PLN. The difference is 780 PLN a year on sample preparation alone, a small sum against the whole bill. The decision about a digital register should therefore not rest on this line alone: the main effect is the daily time of reception and the secretariat, and the certainty of evidence, described in the separate calculation of the cost of the paper declaration.
Scope of responsibility and cost risks
The director should know the limits. InnerWeb does not own the BRCGS standard and does not certify plants: the system provides the register and the evidence for the audit, while the assessment of compliance belongs to the certification body. The register therefore does not replace hygiene procedures; it only documents how they are carried out when guests enter.
There are three cost risks: switching the option on too late, so there is no history of entries before the audit; no defined owner of the declaration wording; and no security training for the emergency channel. All three can be managed organisationally at low cost if they are planned several weeks ahead.
- Switch the option on in good time, so that a history of entries exists before the audit.
- Name the owner of the declaration wording on the quality side.
- Run a short security training on verbal confirmation in the panel.
Split of the 16 hours of paper preparation
Sample calculation: preparing a sample of visits for the audit
| Parameter | Value |
|---|---|
| Audits in the year | 1 audit |
| Paper: quality | 8 h |
| Paper: secretariat | 6 h |
| Paper: archive | 2 h |
| Digital: quality | 2 h |
| Digital: secretariat | 1 h |
| Cost of an hour of work | 60 PLN |
Result: Paper: 16 h and 960 PLN. Digital: 3 h and 180 PLN. Difference: 13 h and 780 PLN per audit.
Note: Sample calculation on the assumptions above, without implementation and hardware cost. Pricing is individual; indicative ranges from 2025 to 2026 implementations depend on scope.
Video
Frequently asked questions
Does the calculation include the price of the system?
No. It shows only the time the plant spends before the audit. Pricing of the implementation is individual and depends on scope.
Does InnerWeb supply gate stations and kiosks?
InnerWeb is a software producer. Hardware such as gate stations and kiosks is bought and integrated according to the plant's needs.
When should the option be switched on before the audit?
Several weeks ahead, so that a history of entries from several working days exists before the audit.
Sources
Ask for a quote for your plant
We will present the scope of configuration, the number of gates and the signing channels. Pricing is individual, and the conversation does not oblige you to buy.
Let's talk