Status of the act and what it does not contain
The Act of 5 December 2024 on Civil Protection and Civil Defence (Dz.U. 2024 item 1907) entered into force on 1 January 2025. Selected provisions, including Article 187, take effect only on 1 January 2027 (Article 212). The act is also affected by an amendment published in 2026 as Dz.U. 2026 item 646; its content should be checked in the current consolidated text before a plant closes its analysis.
For a plant director the key point is a plain one: the act contains no single list of employer tasks with deadlines. Obligations arise in several places and depend on the role the plant plays in a given provision. The position of an owner of a building that served as a shelter differs from that of a business holding sirens, an investor planning a new building, or a critical entity with its own continuity requirements.
The full catalogue of plant obligations and the content of the 2026 amendment need to be confirmed against the text of the act by the plant's legal counsel. Below we describe only provisions that were read directly from the text of the act.
Four groups of provisions that affect a plant
The first group covers protective structures and emergency shelter places. The owner or manager of such a structure or place ensures its maintenance (Article 103) and marks it with the international civil defence sign bearing the word SHELTER, HIDING PLACE or EMERGENCY SHELTER PLACE (Article 105). In practice, a plant with rooms in its buildings that serve this function is responsible for their condition and signage.
The second group is the notification of the local mayor. An owner, perpetual usufructuary or manager of a facility that served as a shelter or hiding place before 1 January 2025 had 90 days from the entry into force of the act to notify the wojt, mayor or city president (Article 207(3)). The deadline expired on 1 April 2025. If the plant is not sure whether such a notification was filed, it should check its correspondence with the municipality, because this is an audit question, not a historical one.
The third group concerns states of emergency and war. Authorities may order a property to be adapted or made available as emergency shelter places (Article 102). Alarm sirens and public address devices held by businesses form part of the notification, warning and alarm system (Article 71). A plant should therefore know which public address devices it has and who is responsible for them.
The fourth group concerns new investments. For building permit applications or notifications filed after 31 December 2025, Articles 93-95 apply: protective structures in public utility buildings where justified and technically feasible, and the design of underground floors and garages in public utility and multi-family buildings so that emergency shelter places can be organised in them. Industrial plants are rarely public utility buildings, but offices, canteens and training facilities on site may fall into this category and require assessment.
Act dates: days from signing to key deadlines
How to turn the provisions into a plant plan
An effective plan starts with an inventory, not with building anything. The plant lists its buildings and rooms, their volume, entrances, power supply, ventilation and access. For each room it records whether it served as a shelter or hiding place before 2025, who manages it and whether it is marked in line with Article 105.
The second layer is capacity and availability. The number of people actually on site changes over the day: production shifts, maintenance shutdowns, visitors, couriers and external companies. Shelter capacity is assessed against peak presence, not headcount. The sooner a plant counts its peak, the fewer surprises at the first exercise.
The third layer is process: who declares the alert, who leads people, who checks completeness, who communicates with the municipality. Without defined roles even a good room does not settle safety. We describe the role of coordinators and people lists in the guide on identification and evacuation and in recommendations for the director.
- Inventory of rooms and protective structures, with the manager of each
- Confirmation whether the mayor notification under Article 207(3) was filed
- Assessment of signage against Article 105 and a plan for additions
- List of public address devices and sirens held by the plant (Article 71)
- Peak number of people on site, split into own staff and external parties
Audit evidence: what a plant should be able to show
The regulations give a plant no ready-made documentation template, so the quality of evidence depends on consistency. An auditor, inspector or board usually asks about three things: does the plant know what it holds, does it know who is on its premises, and can it prove this with a dated document.
For the first question, the evidence is a register of rooms with signage, photos and the date of the last inspection. For the second, it is the list of people on site. In InnerWeb the evacuation list is built from QR code scans at the gate, refreshes every 13 seconds and divides people into six groups: visitors, couriers, suppliers, plant employees, external companies (with a tab per company) and uncertain. Trade-offs in the list are resolved in favour of showing too many people, not too few. The list relies on scans at the gate and does not know a person's position inside a building.
For the third question, the evidence is the exercise report recording time, number of people, conclusions and corrections. The solution supports meeting the requirement and supplies audit material, but it does not replace the decisions of authorities or the plant's evacuation procedure.
Typical mistakes in the first year of the act
The first mistake is waiting for a template from the municipality or the ministry. A template will not arrive in a form that solves the problem of a specific plant, and an inventory needs no form. The second mistake is equating a shelter with a bunker. The act also speaks of hiding places and emergency shelter places, meaning existing rooms that can be adapted if they meet technical requirements.
The third mistake is overlooking external companies. In a continuous-operation plant during a maintenance shutdown there may be more people from external companies than own staff, and a list built only from the employee register will not cover them. The fourth mistake is separating the plan from exercises: a document that has never been tested on people is a hypothesis.
Video
Frequently asked questions
Does every workplace have to have a shelter?
The provisions read do not impose a general obligation to build a shelter in an existing plant. The duties concern maintenance and signage of facilities serving that function and new investments in certain buildings. The plant's individual situation should be confirmed by legal counsel.
Who is responsible for marking a shelter place?
The owner or manager of the protective structure or emergency shelter place. The marking takes the form of the international civil defence sign with the word SHELTER, HIDING PLACE or EMERGENCY SHELTER PLACE (Article 105).
What about the deadline to notify the mayor about former shelters?
Ninety days from the entry into force of the act ended on 1 April 2025. If the plant has no confirmation that the notification was filed, it should clarify this with the municipality and complete its documentation.
Does software ensure compliance with the act?
No. The list of people on site supports the plant's preparation and provides audit evidence, but meeting the act's requirements depends on the plant's decisions, signage and procedures.