InnerWeb
Skip to main content

QR poster registration and plant API checklist

Registration of people from a poster with a QR code works well when the plant checks three things before launch: how companies are searched, how the tax number is verified, and what happens to an account that already exists. Below are nine checkpoints for the administrator and the OHS team, with comments based on how the plant API behaves.

3
minimum number of characters in a query
Source: feature card
8
maximum number of items in an answer
Source: feature card

How registration from a poster works

A poster with a QR code leads the person to the registration form at the plant. In the form the person selects a company, and the system helps find it through the plant API. A well configured process shortens the entry of a contractor, while a badly configured one floods the OHS team with requests for wrong companies.

That is why the administrator checks the settings before the poster goes up, and the OHS team confirms that it knows who handles the requests. It is worth recording the acceptance of registration from the poster in the protocol, in the same way as the acceptance of the integration.

Company search: API limits

The plant API for registration from a poster requires at least 3 letters or digits in the query and returns at most 8 items. This means that a person who types two characters gets no suggestions, and one who types three sees a short list and must narrow the query if the company is not on it.

For the administrator this has a practical consequence: company names in the register should be in the form people actually type, not only in the formal registered form. A company saved under an abbreviation nobody knows will be hard to find, even though the search works correctly.

What a person sees when many similar companies exist

For groups of companies with similar names, the list of 8 items may not contain the one being sought. Encourage contractors to search by tax number: it is unambiguous and shortens the way to the right company.

Company search limits in the plant API

Company search limits in the plant APIThe chart shows a minimum of 3 query characters and a maximum of 8 items in the answer.02468countMinimum characters: 3 count3 countMinimum charactersMaximum items: 8 count8 countMaximum items
Source: Feature card of the plant API for registration from a poster

Tax number verification in the taxpayer register

The system verifies a company by tax number in the register of the Ministry of Finance, that is, on the VAT taxpayer whitelist. A company without VAT is treated as not found. This matters for plants that work with entities exempt from VAT, for example small service providers.

If the plant serves such entities, establish in advance how they are registered: by the administrator adding the company manually to the register, or by a separate route. The poster should not promise registration to people who would drop out this way.

An account that already exists

When the e-mail address in the application already exists at the plant, the accounts are not merged automatically. The person receives a decision asking them to log in with their portal account and confirm with the password, and the panel warns the operator. The safeguard protects against taking over someone else's account by entering their address.

For the OHS team this means additional requests that need a message to the person. Prepare the ready text of the instruction, so that the operator does not write it anew each time.

Supervisor and declaration before launch

Apart from the company configuration, check who the supervisor of a person registering from the poster is, and which declarations the person makes at registration. These elements depend on the plant's policy, for example the requirements of quality standards in the food industry, and should be agreed before the poster is printed.

A change to the declaration after registration launches means that people registered earlier made a different declaration from later ones. Such differences are hard to explain during an audit.

Checklist

Video

Frequently asked questions

Why does a person not see their company on the list?

The list shows at most 8 items, and the query must have at least 3 characters. Narrow the query or search by tax number.

What about a company that is not a VAT payer?

A company without VAT is treated as not found in the register. Set up a manual addition to the register by the administrator.

What does a person with an existing e-mail address see?

The accounts are not merged automatically. The person is asked to log in with their portal account and confirm the password.

Sources

Launch poster registration without surprises

We will go through the whole checklist with the administrator and the OHS team, and carry out a test registration from the QR code to the decision. Book a meeting with InnerWeb.

Let's talk