Pre-arrival training for 20 external contractors at a chemical plant

A chemical plant that is an essential entity under NIS2 admits dozens of people from about 20 external companies to work every month, often on hot work, work at height and work in tanks. Induction training was moved to before arrival, and the whole rollout fitted into 6 weeks.

ca. 20
external companies in maintenance
6 wks
from order to launch
PLN 12,600
net one-off rollout (example)

Starting situation

The plant runs refining and petrochemicals within an international group. Maintenance relies on about 20 external companies, and up to 10 people on the plant side are to use the system. Work permits existed in binders, there was no current picture of open work, and every crew start began with training at the gate.

The maintenance manager and the health and safety officer named three problems. First: training at the gate delays the start of work. Second: it is hard to confirm that the whole crew completed the training, not only the foreman. Third: the validity of electrical (SEP), pressure equipment (UDT) and work-at-height qualifications was tracked by hand in spreadsheets, and on paper nothing enforced the order of safeguards, measurements and signatures.

The questions they started with

The plant asked four questions worth asking in any similar rollout. Can contractor employees be trained before arrival and in their own language? How does the system monitor the validity of training and qualifications for a permit to carry out especially dangerous work? Does it enforce the order of steps for hot work and confined spaces? Does the scope include worker location?

The last question was answered with a deliberate no: the scope covered training, permits and control, without beacons, wristbands or position tracking. Location can be added later on the same instance if the need arises.

Monthly maintenance for 10 users

Monthly maintenance for 10 usersBreakdown of the PLN 2,000 net monthly cost into PLN 800 for licences and PLN 1,200 for the training module.Licences (10 × PLN 80): 800 PLN net (40%)Training module: 1200 PLN net (60%)2000PLN netLicences (10 × PLN 80)800 PLN net (40%)Training module1200 PLN net (60%)
Source: and (indicative ranges from 2025–2026 rollouts; individual quotation)

The solution: one path from training to permit to control

The plant introduced a single path for all external companies. A personal invitation with a QR code arrives by e-mail or SMS, the person completes online training with a test of randomly drawn questions and signs a declaration. The training and the declaration are available in two language versions.

A register of companies and qualifications stores the expiry dates of training and qualifications and sends reminders. If a person has no current training, the system does not admit them to work. A digital permit is created in a dozen or so seconds, goes through approvals and is printed as a PDF in one of the plant's two templates.

Especially dangerous work

Hot work, work at height, confined spaces and work on energy equipment each have their own safeguard lists. Admission matrices control who can issue a permit and who can approve it, and when a permit is created the system checks that the assigned workers hold the required, valid qualifications.

Control in the field

Scanning a person's QR code shows their training, qualifications and today's permit. Control does not require going to the office: the inspector's phone is enough.

The result: schedule and cost

Six weeks passed from order to launch, and no additional infrastructure was required on the customer side: the system runs on a separate server with accounts for 50 people. The rollout cost PLN 12,600 net as a one-off, payable in two instalments: 50% on order and 50% after acceptance of the launch. The structure of this amount is described on the page about the cost of a training system. Indicative ranges from 2025–2026 rollouts; individual quotation.

Monthly maintenance for 10 plant users came to PLN 2,000 net: PLN 800 in licences (10 users at PLN 80) and PLN 1,200 for the training module. Contractor employees are not counted as users, so the cost does not grow with the number of people trained.

What changed in the plant's work

Training stopped being the morning bottleneck. The crew gets an invitation before arrival, and the gate checks the result instead of running the training. The plant has a single register of companies with expiry dates and can see who is affected by the nearest expiry.

The order of safeguards and signatures for especially dangerous work is enforced by the system, not by memory and discipline. The whole path of training, qualifications, permit and control is recorded as evidence for the labour inspectorate, corporate audit and the insurer.

For NIS2 this matters indirectly, but really: Article 21 lists training and supply chain security among risk management measures, and documented training of contractor staff supports meeting this requirement.

Conclusions for similar plants

Four conclusions follow from the rollout. Start with the training and permit module, and add location only when it is justified. Train every person, not only the foreman. For hot work and confined spaces, link the type of work to the required qualifications. Set the training validity period deliberately, for example at 12 months.

  • Training before arrival instead of at the gate.
  • Personal invitations for the whole crew.
  • Admission matrices for especially dangerous work.
  • Warnings about expiring qualifications.

Video

Frequently asked questions

Does pre-arrival training cover every person in the crew?

Yes, the invitation is personal and applies to each person. The company coordinator sees only their own company and can check who has not yet completed the test.

Do licences have to be bought for contractor employees?

No. The licence covers people working in the system on the plant side and company coordinators who announce workers. Contractor employees and guests are not counted.

Does the system verify the authenticity of qualifications with the issuer?

No. The system checks the data recorded in the register, including expiry dates, and warns before expiry. The authenticity of the document is still assessed by the responsible person on the plant side.

Does the rollout require worker location?

No. In this case the rollout covered training, permits and QR code control. Location can be added later on the same instance.