The situation: a refinery on the critical entities register
We describe a petrochemical plant in a refinery that is an essential entity under NIS2 and receives notice of its entry in the register of critical entities kept by the Government Centre for Security (RCB). The site covers several hundred hectares, and operational safety of production is handled by a specialised department. The plant has its own system of permits, qualifications and training, plus intrinsically safe phones and gas detectors with Bluetooth.
From the day of the entry notice the statutory deadlines start to run: 9 months for the risk assessment, 3 months after it for organisational and technical solutions, and 15 months for documentation (Journal of Laws 2026, item 815, Articles 6zt and 6zu of the Polish Crisis Management Act). Among the areas that must be covered, the Act lists personnel security for employees and external suppliers, and physical protection with access control.
The problem: nobody knows where the person is
GPS coverage on the installation is limited by structures and dense equipment, so the operator cannot be sure where an employee is or where the hazard is. In such a plant the assessment of adversarial and emergency risk ends with one question: how many people are in the zone and how quickly can they be found.
The customer's permit system authorises work, but it does not confirm that what was ordered is actually happening: who is really in the zone and where supplier vehicles are. There is also a technical and financial constraint: the plant runs on Ex phones with Android 9 or 11 and Bluetooth 4.2, and does not plan to replace hardware.
- How do you establish a person's position in an Ex zone when GPS does not work?
- Are the Ex phones and detectors the plant already owns enough?
- Which zones are the beacons approved for?
- Is the on-site personnel list suitable for evacuation?
- Do the current permit systems have to be replaced?
Position deviation in the simulation, beacons every 100 m
The solution: a location overlay on existing systems
BLE beacons in ATEX versions, approved for zones 2 and 22, are placed across the installation. For zones 1 and 21, certification is commissioned for the needs of the customer's installation, with no promise of a date. The employee's Ex phone receives signals from several beacons at once, together with the strength of each, and sends them over the cellular network or Wi-Fi every few seconds. The position is averaged on the map from the signals of many beacons, not determined by a "strongest wins" method. The system works without GPS.
The mobile app detects SOS, lack of movement and a fall on the phone and passes them to the dispatcher with the last known location. The evacuation list shows who is in the zone, refreshed every dozen or so seconds, and can be printed for the incident commander. The whole thing works as an independent overlay that complements and tightens the existing permit, qualification and training systems, and integrations are built only when the plant needs them.
The plant chooses where the system runs: its own server or the cloud. Data stays with the customer. The site plan is created in the map editor by the deployment team.
Parameters and figures from the project
Beacons are placed along plant roads at intervals of about 100 m. In an illustrative section of the installation covering 106 beacons about 100 m apart, the simulation gave an average position deviation of 15 m and a maximum of 39 m. These are estimated values from a simulation, not an as-built measurement, and the density in critical places is designed on this basis. In buildings, 1 beacon per 100–200 m² is assumed.
The industrial beacon operates in a temperature range from -40 to 60 °C and runs on industrial batteries for several years, which limits the number of service entries into Ex zones. For scale: InnerWeb has 20 deployments and pilots behind it and 16,000 installed beacons, and in a city project 11,000 transmitters with an accuracy below 1.5 m.
The effect on CER obligations
Location is not in itself an organisational and technical solution under Article 6zt, but it provides evidence that personnel security rules work in practice. The plant gains a live picture of who is doing what work and where, and an on-site personnel list that can be used in exercises and in a real evacuation. Records from the system support the critical infrastructure protection documentation and evidence for the auditor.
In the event of a significant incident that must be reported within 24 hours, the team has data at hand on who was in the zone of the event. This shortens the fact-finding stage before the report, but it does not remove the decision on whether the incident is significant.
Conclusions for plants with a similar profile
Risk assessment comes first, then the choice of measures: location enters the plan only when the assessment shows human exposure that the operator cannot see. The equipment the plant already has is worth using as a receiver and relay instead of buying new devices. Integration with the permit system is postponed until there is a real need, and the start should not depend on it.
Video
Frequently asked questions
Is worker location a CER requirement?
No. The Act lists personnel security for employees and suppliers as an area to be covered. The choice of measures follows from the risk assessment and is to be proportionate to its result.
Do Ex phones have to be replaced?
No, if they support Bluetooth and the app. In the case described as the model, the phones ran Android 9 or 11 with Bluetooth 4.2.
Where is the data stored?
The plant chooses: its own server or the cloud. Data stays with the customer.
Which zones are the beacons approved for?
Zones 2 and 22. For zones 1 and 21, certification is commissioned for the needs of the customer's installation, with no promise of a date.
Sources
Let us check location on your installation
We will prepare a preliminary beacon layout for a section of the site and show a deviation simulation. Get in touch and we will agree the scope.
Let's talk