How the system identifies a firm at registration
A person registering from the QR poster identifies the external firm in one of two ways: selects it from a list of firms known to the plant, or enters its tax ID (NIP). In the second case the system fetches the data from the Ministry of Finance register, that is the VAT taxpayer white list, and shows them to the person for confirmation.
Two elements are key here. First, a firm is never created from a name typed by hand, so typing errors and false names do not get into the records. Second, a firm without VAT taxpayer status is not found, and the person is directed to reception, where a human makes the decision.
Practice 1: treat the register as a filter, not as a recommendation
Presence in the VAT taxpayer register shows that the entity is registered as a taxpayer. It does not show that it is a reliable contractor, that it is qualified for a given job, or that the plant has a contract with it. The procurement department should therefore treat the result as a first filter before further checks.
We recommend setting out in the procedure what security does after seeing a firm from the register: comparison with the list of current contracts and orders, checking whether the host really knows about the visit, and asking about the scope of work if needed.
Search limits at registration
Practice 2: handle firms outside the register
A firm without VAT, for example a person running a business exempt from VAT, a foreign entity or a sole-trader contractor, will not be found. The person is then directed to reception. This is intended behaviour, not an error.
Prepare a simple path at reception: check the company's registration document, contact the host, and a decision by an authorised person to add the firm to the records. Define who may add such firms and how the basis for the decision is documented.
- Reception asks for the firm's registration document.
- The host confirms the visit.
- An authorised person adds the firm to the records.
- The entry contains the date and the basis for the decision.
Practice 3: limit the disclosure of data in searches
Searching for firms and hosts at registration requires at least 3 letters or digits, returns at most 8 items, and does not reveal e-mail addresses or phone numbers. This protects the records against browsing by outside persons.
For the plant this implies two hints. Name firms consistently in the records, so that three letters are enough to find them. For very similar names, use the NIP as well, because a list limited to eight items may not show all of them.
Practice 4: one NIP, one record
Order in the register of firms is a condition for effective verification. Duplicate firms with the same NIP, old names after mergers and typing errors in numbers mean that registration does not recognise the firm or recognises the wrong one.
Once a quarter, review the register: search for duplicate NIP numbers, check firms without an active contract, and close those with which cooperation has ended. These few hours of work save dozens of questions at reception later.
Practice 5: a trail of decisions for audit
A verification of a firm makes sense if it leaves a trace. Record in the procedure which data are checked (NIP, name, status in the register), who checks them (security, procurement), and what the evidence is (an entry in the records with a date).
Do not describe the procedure as a guarantee of a contractor's reliability. Describe it as the checks the plant applies before admitting a firm to the site, which can be shown to an auditor.
Checklist
Video
Frequently asked questions
Can I add a firm by typing its name?
Not at registration from the poster. The firm comes from the list or from the NIP in the register, not from a manually typed name.
What does the system do when a firm is not a VAT taxpayer?
It does not find the firm, and the person is directed to reception, where a human makes the decision.
Does the search show the phone numbers of hosts?
No. The results do not reveal e-mail addresses or phone numbers.
Sources
Let's talk about the contractor portal at your plant
We will show you on a live example how a contractor's request reaches the operator and how the plant keeps full control over entry to the site.
Let's talk