InnerWeb
Skip to main content

Guest reception: registration and QR badge in one step

The reception in an office block next to a production plant receives guests for various reasons: a meeting, a delivery, a job interview. The system lets you register a guest and print a QR badge with a registry number in one move. Below are the practices that make this easier.

5 to 2 min
guest reception time at the desk
Source: illustrative calculation
1 step
registration and QR badge printing
Source: system function documentation

What one step means

The reception registers the guest and prints a QR badge with a registry number in one step. The receptionist does not retype the data into a separate program or look for a printer in another window: once the guest is registered, the badge comes out of the printer.

The registry number on the badge links the physical person to the entry in the register. The QR code is read at the gate and at the kiosks, so the guest does not have to repeat their details at each door.

Practices at the reception desk

Four practices that shorten the reception of a guest and reduce the number of errors.

An invited guest enters without retyping

If the guest was invited, their data is already in the system. The reception searches for them and prints the badge. An account created from an invitation activates by itself once the password is set, while an account from self-registration requires approval by a person with authority: the guard, the administrator, a manager or occupational health and safety. It is worth agreeing who approves accounts during the reception's opening hours.

An unannounced guest registers from the QR poster

Registration from the QR poster through the portal creates a visit for today, and the guest chooses the host themselves. The reception shortens the service time, because part of the work is done by the guest on their own phone, and the employee only verifies the result and prints the badge.

Introductory training on a tablet

A supplier, a courier or a guest can complete the introductory training on a tablet by themselves. The kiosk recognises a trained person and welcomes them, while an untrained person is shown the training. A tablet at the reception relieves the employee who previously had to explain the rules verbally.

A guest without a password is not blocked

A guest who completed the training but did not set a password is let through the gate like an active account, and on the lists has the status No password. The password is needed only to log in to the system. The reception therefore does not need to require a password from someone who came for an hour.

Reception time with 30 guests a day

Reception time with 30 guests a dayBar chart: 150 minutes a day with manual registration against 60 minutes with the QR badge.050100150min/dayManual registration: 150 min/day150Manual registrationOne step with QR badge: 60 min/day60One step with QR badge
Source: Illustrative calculation: 30 guests a day, 5 min for manual registration, 2 min with a badge

Organising the workstation

The badge printer should stand within the employee's reach, with a supply of paper and labels in a visible place. Arrange a backup for a printer failure: the visit can be registered and the badge printed at a second workstation. Rehearse the scenario with one guest and with a group, to check how quickly the queue clears.

A separate matter is the order of entry. If the reception is in an office block and the production hall is a few dozen metres away, the badge should be worn in view from the first step. The gate onto the plant site reads the code and checks training, qualifications and an active account.

Illustrative calculation: guest reception time

Assuming 30 guests a day and a reception time of 5 minutes without the system versus 2 minutes with registration and a badge in one step, the reception saves 90 minutes a day. This is an illustrative calculation based on our own assumptions, not a measurement at a specific plant. The time saved usually returns as a shorter queue at peak hours, rather than as a freed-up workstation.

Checklist

Video

Frequently asked questions

Must a badge have a registry number?

The system prints a QR badge with a registry number. The number links the person to the entry in the register.

Will a guest without a password get onto the site?

Yes, if they completed the training. On the lists they have the status No password, and the password is needed only to log in to the system.

Who approves an account from self-registration?

A person with authority: the guard, the administrator, a manager or occupational health and safety.

See the reception with a QR badge

We will show registration and badge printing in one step, using an example of a reception in an office block next to a plant.

Let's talk